My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> Revise 1-07.1 by replacing the second sentence of the first paragraph with the <br /> following: <br /> ' The Contractor shall indemnify, defend, and save harmless the City (including its <br /> agents, officers, and employees) against any claims that may arise because the <br /> Contractor (or any employee of the Contractor or Subcontractor or material <br /> person) violated a legal requirement[Added per Addendum 1]. <br /> 1-05 CONTROL OF WORK <br /> ' 1-05.1 Authority of the Engineer <br /> Delete 1-05.1 and substitute the following: <br /> ' 1-05.1 City <br /> The City, and the City's Representative, shall have the authority to act as the sole judge of <br /> ' the Work and materials with respect to both quantity and quality as set forth in the Contract. <br /> It is expressly stipulated that the Plans, Specifications and other Contract Documents set <br /> forth the requirements as to the nature of the completed Work and do not purport to control <br /> ' the method of performing Work except in those instances where the nature of the <br /> completed Work is dependent on the method of performance. <br /> The City has the authority to act, do, perform, and make all decisions and actions <br /> ' authorized by the Contract Documents, including, but not limited to, Change Orders, <br /> progress payments, contract decisions, acceptability of the Contractor's Work, and early <br /> possession. The City has the authority to accept or reject requests for progress payments <br /> ' that have been submitted by the Contractor and recommended by the City's <br /> Representative. The City has the authority to make determinations of the acceptability of <br /> the Work. The City also has the authority to accept or reject the City's Representative's <br /> recommendations regarding retention of defective Work. <br /> 1-05.2 Authority of Assistants and Inspectors <br /> Delete 1-05.2 and substitute the following: <br /> ' 1-05.2 City's Representative <br /> The City's Representative shall be satisfied that all the Work is being done in accordance <br /> ' with the requirements of the Contract. The Contract and Specifications give the City's <br /> Representative authority over the Work. Whenever it is so provided in this Contract, the <br /> decision of the City's Representative shall be final. <br /> ' The City's Representative's decisions will be final on all questions including, but not limited <br /> to, the following: <br /> 1. Quality and acceptability of materials and Work; <br /> 2. Measurement of Work, whether lump sum, Force Account, or unit price; <br /> 3. Acceptability of rates of progress on the Work; <br /> ' 4. Interpretation of Plans and Specifications; <br /> 5. Determination as to the existence of changed or differing site conditions; <br /> 6. Fulfillment of the Contract by the Contractor; <br /> ' 7. Payments under the Contract including adjustment; <br /> 8. Suspension(s) of Work; <br /> ' 9. Termination of the Contract for default or public convenience; and <br /> 10. Approval of working or detail Plans and Submittals. <br /> ' Sewer 0 WO No-UP3691 Division 1 -GENERAL REQUIREMENTS Addendum No. 1 <br /> SP-65 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.