My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> 1-07.18(5)G Professional Liability <br /> ' The Contractor, its Subcontractor and its design consultant providing construction <br /> management, value engineering, or other design-related non-construction <br /> professional services shall provide evidence of Professional Liability insurance <br /> ' covering professional errors and omissions. Such policy shall provide the <br /> following minimum limits: <br /> $2,000,000 per Claim <br /> If the scope of such design-related professional services includes work related to <br /> pollution conditions, the Professional Liability insurance shall include Pollution <br /> Liability coverage. <br /> ' If insurance is on a claims made form, its retroactive date, and that of all <br /> subsequent renewals, shall be no later than the effective date of this Contract. <br /> 1-07.18(5)H Builder's Risk <br /> ' If the Project includes construction of a structure, the Contractor shall maintain <br /> property insurance under an "All Risk Builder's Risk" form in an amount equal to <br /> the value of the structure in a form acceptable to the City. The structure shall <br /> have All Risk Builder's Risk Insurance inclusive of earthquake and flood subject to <br /> customary industry deductibles. <br /> 1-07.20 Patented Devices, Materials, and Processes <br /> ' Delete the first paragraph of 1-07.20 and substitute the following: <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> ' materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> actions of any nature for, or on account of the use of any patented devices, materials, <br /> ' or processes. <br /> 1-07.23 Public Convenience and Safety <br /> Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br /> ' Nothing contained in this Contract is intended to create any third-party beneficiary <br /> rights in favor of the public or any individual utilizing the facilities being constructed or <br /> improved under this Contract. <br /> ' 1-07.23(1) Construction Under Traffic <br /> Revise the third sentence of the second paragraph to read as follows: <br /> Do NOT impair accessibility to existing or temporary pedestrian push buttons. <br /> City may allow activating pedestrian recall timing or other accommodations during <br /> construction. <br /> Supplement 1-07.23(1) by adding the following' <br /> If Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the <br /> Contractor in writing of any change in the closure hours. <br /> ' Full street closures will not be allowed on a holiday or holiday weekend, or after <br /> 12:00 p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is <br /> defined as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> ' Provide a uniformed off-duty Police Officer to control traffic in critical situations as <br /> determined by the Engineer. The uniformed officer shall be paid under contract <br /> item "Traffic Control -Off-Duty Police Officer." <br /> ' Notify the local Fire, Police and Engineering Departments before the beginning of <br /> each phase of construction so that these agencies may re-route their emergency <br /> Sewer 0 Division 1 -GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No-UP3691 SP-95 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.