I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> vehicles around the construction zone. The non-emergency phone number for <br /> Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public Works <br /> Engineering is 257-8800. <br /> Notify City of Everett Transit at 425-257-8984 and Community Transit at 425-348- <br /> 7100 of all street closures or delays at least 5 days in advance to enable rerouting <br /> of buses. Coordinate relocation of bus stops with Everett Transit. <br /> Notify the property owners at least 72 hours in advance to enable them to remove <br /> vehicles parked in the vicinity of Work. Towing vehicles shall be the responsibility of <br /> the Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> (******) <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2) TRAFFIC CONTROL PLANS. <br /> Refer to 1-08.4(3) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. 1 <br /> Notify all affected property owners prior to commencing the barricading of <br /> streets, sidewalks and driveways. <br /> All business driveways shall remain open except as necessary to permit <br /> curing of construction materials or for short periods of time as required for <br /> excavations. However, at least one driveway per business shall remain open <br /> to vehicular traffic at all times unless otherwise approved by the Engineer and ' <br /> affected property owner in writing. <br /> Signs and barricades shall be supplemented by lanterns or flasher units <br /> during the hours of darkness. , <br /> Drivers of motor vehicles used in connection with the construction shall obey <br /> traffic rules posted for such location in the same manner and under the same <br /> restrictions as provided for the drivers of private vehicles. <br /> Conduct the Work, at all time throughout the project, in such a manner as will <br /> obstruct and inconvenience vehicular and pedestrian traffic as little as <br /> possible. Keep the streets, sidewalks and private driveways open except for <br /> the brief periods when actual Work is being done. <br /> 1-07.24 Rights of Way <br /> Deletel-07.24 and substitute the following: <br /> Street right of way lines, limits of easements, and limits of construction permits are <br /> indicated on the Plans. The Contractor's construction activities shall be confined within <br /> these limits, unless arrangements for use of private property are made. <br /> Generally, the City will have obtained, prior to bid opening, all rights of way and <br /> easements, both permanent and temporary, necessary for carrying out the Work. <br /> Exceptions to this are noted on the Plans. <br /> Whenever any of the Work is accomplished on or through property other than public <br /> right of way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> easement agreement obtained by the City from the owner of the private property. <br /> Copies of the easement agreements may be included in the Contract Documents or <br /> made available to the Contractor as soon as practical after they have been obtained by <br /> the Engineer. <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—96 May 2020 <br />