My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for <br /> Federal-aid Projects (Form 420-004). <br /> The Contractor's records pertaining to the requirements of this Special Provision shall <br /> be open to inspection or audit by representatives of the City during the life of the <br /> Contract and for a period of not less than three years after the date of acceptance of <br /> the Contract. The Contractor shall retain these records for that period. The Contractor <br /> shall also guarantee that these records of all Subcontractors and lower tier <br /> subcontractors shall be available and open to similar inspection or audit for the same <br /> time period. <br /> Contractor shall not sublet to a single Subcontractor more than one-half of the Project. <br /> The City may refuse to approve any subcontract for any reason. Subcontractors will <br /> be considered agents of the Contractor and their work shall be subject to the <br /> provisions of the Contract. References in the Contract Documents to actions required <br /> of Subcontractors, manufacturers, suppliers, or any person other than the Contractor, <br /> the City or the City's Representative shall be interpreted as requiring that the <br /> Contractor shall require such Subcontractor, manufacturer, supplier or person to <br /> perform the specified action. <br /> ' 1-08.3 Progress Schedule <br /> 1-08.3(1) General Requirements <br /> Delete 1-08.3(1) and substitute the following: <br /> 1-08.3(1) General <br /> (******) <br /> 1 Because time is of the essence, diligent and expeditious progress and completion of <br /> the Work by the Contract Completion Date is required of the Contractor. Careful, <br /> adequate, accurate and complete planning and scheduling of the Work by the <br /> Contractor, both prior to the start of, and throughout, construction, is vital to the <br /> success of this Project for both the Contractor and the City. The purposes of the <br /> schedules and reports include: <br /> 1. Ensuring adequate planning and execution of the Work by the Contractor. <br /> 2. Assisting the City or its representative in monitoring construction. <br /> 3. Assessing the impact of any actual, potential or proposed change, including, <br /> but not limited to, the financial impact resulting from schedule changes and <br /> changes to the scope of Work. <br /> 4. Supporting the basis for construction payments. <br /> r5. Planning by City and tenants. <br /> 6. Avoiding additional or extra costs or expenses to the City. <br /> All schedules will be reviewed by the City and the City's Representative. The City or <br /> City's Representative's review of any schedule shall not transfer the Contractor's <br /> responsibilities to the City. Review shall not constitute approval or acceptance of the <br /> ' Contractor's construction means, methods, sequencing, logic, order, precedence and <br /> succession of activities or Contractor's ability to complete the Work in a timely manner. <br /> Any mistakes or errors in any schedule, including, but not limited to, mistakes or errors <br /> of logic, order, precedence, and duration, are and remain the Contractor's. The City or <br /> City's Representative may, however, comment upon the schedule. The Contractor <br /> remains wholly responsible for completing the Work within the Contract duration. Any <br /> comments by City or City's Representative personnel regarding the schedule shall not <br /> be construed as approval or ratification, nor shall the Contractor incorporate or change <br /> Sewer 0 Division 1 -GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No-UP3691 SP-101 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.