My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> Engineer no later than noon on the working day prior to the day for which the <br /> Contractor is requesting permission to work, unless a noise variance will be required. <br /> In such case provide request a minimum of 30 days prior to performing the work, see <br /> also Section 1-07.1(1) NOISE. <br /> Permission to work Saturdays, Sundays, holidays or other than the agreed upon <br /> normal straight time working hours Monday through Friday may be given subject to <br /> certain other conditions set forth by the City or Engineer. These conditions may <br /> include, and not be limited to; requiring the Contractor to reimburse the City for the <br /> costs in excess of straight-time costs for City employees and necessary assistants who <br /> worked during such times, on non-Federal aid projects. Assistants may include, and <br /> are not be limited to, survey crews; personnel from the City's material testing lab; <br /> inspectors; and other City employees when in the opinion of the Engineer, such work <br /> necessitates their presence. The work performed on Saturdays, Sundays, and <br /> holidays will be considered as working days with regards to the Contract Time; and <br /> considering multiple work shifts as multiple working days with respect to Contract Time <br /> even though the multiple shifts occur in a single 24-hour period. <br /> 1-08.0(3) Reimbursement for Overtime Work of City Employees and <br /> Assistants <br /> Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than <br /> an 8-hour work shift on a regular working day, as defined in the Standard <br /> Specifications, such work shall be considered as overtime work. On all such overtime <br /> work an inspector will be present, and a survey crew may be required at the discretion <br /> of the Engineer. If such work is the result of Contractor's inability to complete work or <br /> coordinate materials, equipment and labor in accordance with agreed schedule, then <br /> the City may deduct from amounts due or to become due to the Contractor for the <br /> costs in excess of the straight-time costs for employees and assistants of the City <br /> required to work overtime hours. <br /> The Contractor by these specifications does hereby authorize the Engineer to deduct <br /> such costs from the amount due or to become due to the Contractor. <br /> 1-08.1 Subcontracting <br /> Delete the eighth paragraph in 1-08.1 and substitute the following: <br /> On all projects funded with City funds only, the Contractor shall certify to the actual <br /> amounts paid Disadvantaged, Minority, or Women's Business Enterprise firms that <br /> were used as subcontractors, lower tier subcontractors, manufacturers, regular <br /> dealers, or service providers on the Contract. This certification shall be submitted to <br /> the Engineer on WSDOT form 140-542 within 20 calendar days after physical <br /> completion of the Contract. <br /> Supplement 1-08.1 by adding the following: <br /> The Contract Documents shall apply to Subcontractors and suppliers as if each had <br /> signed the Contract with the City. Contractor shall include the provisions of these <br /> Contract Documents or a "flow down" clause in each contract with Subcontractors and <br /> suppliers. <br /> The City will not approve a Subcontractor that is also providing services to the City on <br /> the same project. <br /> No Subcontractor or lower tier subcontractor will be permitted to perform Work under <br /> the Contract until the following documents have been completed and submitted to the <br /> Engineer: <br /> 1. Request to Sublet Work (Form 421-012), and ' <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—100 May 2020 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.