My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> Costs incurred in performance of this Work shall be included in the contract bid <br /> items and no direct compensation shall be paid. <br /> 1-08.4 Prosecution of Work <br /> Delete 1-08.4 and substitute the following: <br /> 1-08.4 Notice to Proceed and Prosecution of Work <br /> The City will issue a Notice to Proceed after the Contract has been executed and the <br /> Contract Bond and evidence of insurance have been approved and filed by the City. The 111 <br /> Contractor shall not commence with the Work until the Notice to Proceed has been given <br /> by the City. The Contractor shall commence construction activities on the Project site <br /> within 14 calendar days of the Notice to Proceed Date, unless otherwise approved in <br /> writing. The Contractor shall diligently pursue the Work to the Physical Completion Date <br /> within the time specified in the Contract. Voluntary shutdown or slowing of operations by <br /> the Contractor shall not relieve the Contractor of the responsibility to complete the Work <br /> within the time(s) specified in the Contract. <br /> The City is not obligated to accept or pay for Work performed by the Contractor or be liable <br /> for any Delays, prior to delivery of the Notice to Proceed. The City's knowledge of Work <br /> 111 <br /> being performed prior to delivery of the Notice to Proceed will not obligate the City to <br /> accept or pay for such Work. Contractor waives any and all Contract Claims for an <br /> adjustment of Contract Sum or Contract Time arising out of, or related to, Work it performs <br /> prior to receipt of the Notice to Proceed. <br /> The City may issue partial Notices to Proceed. Contractor may seek permission in writing <br /> to perform some Work prior to issuance to the Notice to Proceed, such as shop drawings, <br /> equipment and material Submittals, or surveying and the City or City's Representative may, 111 <br /> in its sole discretion, approve in writing such Work prior to the issuance of the Notice to <br /> Proceed. <br /> Supplement 1-08.4 by adding the following: <br /> 1-08.4(1) Construction Progress <br /> (******) <br /> The Contractor shall furnish all labor, materials, facilities and Equipment necessary to <br /> ensure the prosecution and completion of the Project within the interim milestones, <br /> Substantial Completion, Physical Completion and Completion Dates of the Contract. If <br /> Work falls seven calendar days or more behind the reviewed Preliminary Schedule, the <br /> Contractor agrees that, at its sole cost and expense, it will take all actions necessary to <br /> return the Project to the accepted schedule. These actions may include the following. <br /> a. Increase labor in quantities and crafts. <br /> b. Increase the number of working hours per shift, shifts per working day, <br /> working days per week, or the amount of Equipment, or any combination of <br /> the foregoing. <br /> c. Reschedule activities. <br /> If requested by the City's Representative, the Contractor shall prepare a proposed I <br /> schedule revision demonstrating a plan to make up the lag in progress and insure <br /> completion of the Work within the Contract Time. All actions taken to return the Project <br /> to the accepted schedule are at the Contractor's expense. <br /> The Contractor shall pay all costs incurred by the City that result from the Contractor's <br /> action to return the Project to its accepted schedule, including, but not limited to, <br /> additional, overtime, or third party inspection, design and construction management <br /> service costs. Contractor agrees that City shall deduct such charges from payments <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—106 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.