I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> If Contractor disagrees with the adjustment of Contract Sum determined by the City's <br /> Representative, Contractor may submit a Contract Claim for the difference between <br /> the amount determined by the City's Representative and the amount sought by the <br /> Contractor. <br /> Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br /> uncompleted Work will be allowed. <br /> 1-09.6 Force Account <br /> Supplement 1-09.6 by adding the following: <br /> The City has estimated and included in the Proposal, dollar amounts for all items to be <br /> paid per Force Account, only to provide a common Bid for Bidders. All such dollar <br /> amounts are to become a part of Contractor's total bid. However, the City does not <br /> warrant expressly or by implication that the actual amount of Work will correspond with <br /> those estimates. Payment will be made on the basis of the amount of Work actually <br /> authorized by Engineer. <br /> 1-09.7 Mobilization <br /> Supplement 1-09.7 by adding the following: <br /> 1. Construction Identification Signs: Upon commencement of Work, the Contractor <br /> furnish and erect two Project/Construction Identification Signs in accordance with <br /> COE Standard Drawing No. 714, one at each end of each work area at Engineer <br /> approved. <br /> a. Provide sign painting, lettering and detailing by a professional sign maker with <br /> Engineer approval prior to placement on job site. <br /> b. Provide a Project Information Sign for each of the two Project/Construction <br /> Identification Signs. Attach Project Information Sign to the surface of the sign <br /> face in accordance with COE Standard Plan No. 714. The Construction <br /> Identification Sign shall contain the following three lines of information that the <br /> Engineer will provide: <br /> PROJECT NAME: <br /> PROJECT FUNDING: <br /> PROJECT COST: <br /> c. Maintain signs and sign frames in a clearly legible condition throughout the <br /> progress of the Work. Completely remove signs upon project completion <br /> Deliver signs to the City's storage area for future City use. <br /> d. No separate payment for Project/Construction Identification Signs will be <br /> made. All costs associated with this item shall be merged with the unit <br /> contract price for"Mobilization." <br /> 1-09.9 Payments <br /> Delete 1-09.9 and substitute the following: <br /> 1-09.9 Payments to Contractors <br /> (******) <br /> 1-09.9(1) Progress Payments <br /> Contractor shall submit progress payment estimate for completed Work and material <br /> on hand based upon acceptable Work performed during the previous month, or since <br /> the last partial payment estimate was submitted. Submit progress payment estimate to <br /> City's Representative by the tenth day of each month, or by schedule mutually agreed <br /> upon in writing by the Contractor and City's Representative at the Pre-Construction <br /> Conference. Contractor shall make initial progress estimate not later than 30 days <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—121 May 2020 <br />