My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> company. Such check shall be converted into bonds and securities chosen by <br /> the Contractor as the interest accrues. <br /> The Contractor shall designate the option desired at the time the Contract is executed. <br /> If the Contractor in chooses option 2, deposit in escrow account, Contractor agrees to <br /> assume full responsibility to pay all costs that may accrue from escrow services, <br /> brokerage charges or both, and further agrees to assume all risks in connection with <br /> the investment of the retained percentages in securities. <br /> Retainage will be released when all of the following conditions are satisfied: <br /> 1. Sixty days have elapsed following the completion of all Work specified in the <br /> Contract; and <br /> 2. The Contractor fulfilled all of all obligations of the Contractor under the <br /> Contract, including, but not limited to, the Contractor's furnishing all <br /> documentation required by Contract and law; and <br /> 3. A release has been obtained from the Washington State Department of <br /> Revenue; and <br /> 4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file <br /> with the City (RCW 39.12.040); and <br /> 5. A release has been obtained from the Washington State Department of Labor <br /> & Industries and the Washington State Employment Security Department; <br /> and <br /> 6. All claims, as provided by law, filed against the retainage have been resolved. <br /> In the event claims are filed and provided the conditions one through five are <br /> met, the Contractor will be paid the retained percentage less an amount <br /> sufficient to pay any such claims together with a sum determined by the City <br /> sufficient to pay the cost of claims and attorney's fees. <br /> 1-09.11 Disputes and Claims I <br /> Delete 1-09.11 and substitute the following: <br /> 1-09.11(1) Disputes <br /> (******) I <br /> When a Dispute occurs during the Contract, the Contractor shall pursue resolution <br /> through the City's Representative. The Contractor shall follow the procedure outlined <br /> in section 1-09.11(2) CONTRACT CLAIMS herein and 1-08.3 PROGRESS <br /> SCHEDULE and 1-08.8 EXTENSIONS OF TIME for issues regarding the schedule <br /> and Contract Time. Timely and adequate Notice is a condition precedent to a Contract <br /> Claim. Timely and complete submission of a Contract Claim is a condition precedent <br /> to any entitlement by the Contractor to an adjustment of Contract Sum or Contract <br /> Time. Unless waived in writing by the City, mediation is a condition precedent to the <br /> filing of any lawsuit, action or proceeding that seeks to recover on a Contract Claim, <br /> whether in whole or in part. The costs of any such mediation will be borne equally by <br /> the parties. Unless otherwise agreed by the parties, the mediation shall take place in <br /> Everett, Washington. <br /> 1-09.11(2) Contract Claims <br /> (******) <br /> 1-09.11(2)A General <br /> If the Contractor requests or believes for any reason that additional compensation <br /> or an extension of Contract Time is due it, including, but not limited to, breach of <br /> Contract or request for adjustment of Contract Sum or Contract Time, or if the <br /> Contractor has a Dispute with the City and wants the City to take some action, or <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—126 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.