My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> refrain from taking action, the Contractor shall file a Contract Claim as provided in <br /> this section. A timely and complete Contract Claim is a condition precedent to any <br /> entitlement by the Contractor to an adjustment of Contract Sum or Contract Time. <br /> No Contract Claim shall be allowed unless the Contractor has given Notice. The <br /> Contractor waives any Contract Claim if: (a) Notice was not timely given; (b) the <br /> City's Representative is not afforded reasonable access by the Contractor to <br /> complete records, including, but not limited to, correspondence, job diaries, and <br /> actual cost and additional time incurred; (c) a Contract Claim is not timely filed as <br /> required by the Contract Documents; or (d) adequate, accurate, contemporaneous <br /> and segregated supporting time and expense records are not kept and <br /> maintained. The fact that the Contractor provided proper and timely Notice, <br /> provided a properly filed Contract Claim, or provided the City's Representative <br /> access to records of actual cost, shall not in any way be construed as proving or <br /> substantiating the validity of the Contract Claim. If the City determines the <br /> Contract Claim has merit in whole or in part, the City's Representative will make <br /> an adjustment of Contract Sum or Contract Time required for the Work, or both. If <br /> the City's Representative finds the Contract Claim to be without merit, no <br /> adjustment will be made. <br /> The Contractor shall keep full, complete, accurate and contemporaneous records <br /> of the costs and additional time incurred for any Contract Claim. The Contractor <br /> shall permit the City's Representative to have access to those records and any <br /> other records as may be required by the City's Representative to determine the <br /> facts or contentions involved in the Contract Claim. City is not obligated to <br /> respond to a Contract Claim unless the Contractor is in full compliance with all the <br /> provisions of the Contract Documents and the formal Contract Claim document <br /> has been submitted <br /> Full compliance by the Contractor with the provisions of this section is a <br /> contractual condition precedent to the Contractor's right to sue or seek any <br /> recovery against the City in any legal proceeding. <br /> 1-09.11(2)B Contents <br /> All Contract Claims filed by the Contractor shall be in writing, verified under <br /> penalty of perjury by an officer or principal of the Contractor, and in sufficient detail <br /> to enable the City's Representative to ascertain the basis and amount of the <br /> Contract Claim. All Contract Claims shall be submitted to the City's <br /> Representative. At a minimum, each Contract Claim shall include: <br /> 1. A detailed factual statement of the Contract Claim for additional <br /> compensation and extension of Contract Time, if any, providing all <br /> necessary dates, locations, and items of Work affected by the Contract <br /> Claim. <br /> 2. The dates of all facts related to the Contract Claim. <br /> 3. The name of each City's individual, official, or employee involved in or <br /> knowledgeable about the Contract Claim. <br /> 4. The specific provisions of the Contract that support the Contract Claim <br /> and a statement of the reasons why such provisions support the Contract <br /> I Claim. <br /> 5. If the Contract Claim relates to a decision of the City's Representative <br /> that the Contract leaves to the City's Representative's discretion or as to <br /> which the Contract provides that the City Representative's decision is <br /> final, the Contractor shall set out in detail all facts supporting its position <br /> relating to the decision of the City's Representative. <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—127 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.