My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown & Caldwell 7/22/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
Brown & Caldwell 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 10:15:49 AM
Creation date
7/29/2020 10:15:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown & Caldwell
Approval Date
7/22/2020
Council Approval Date
7/8/2020
End Date
12/31/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Reservoir 3 Cover Repairs
Tracking Number
0002366
Total Compensation
$99,668.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope: <br /> The Consultant will prepare an RFP that describes submittal requirements, RFP evaluation criteria, <br /> Project technical and performance requirements, and key contract/commercial terms for the <br /> Project. It's assumed that this will be a streamlined RFP focused on cost and other select <br /> requirements. Furthermore, it's assumed that the City will provide scope of work requirements to <br /> incorporate into the RFP. <br /> It is assumed that technical and performance requirements will address structural modifications and <br /> repairs, selective demolition; site work; coatings; protection of existing facilities; coordination <br /> requirements; design and permitting including adherence to Department of Health regulations; <br /> testing; and schedule including integration with the City's overall water supply/treatment <br /> constraints. <br /> Commercial requirements will include items such as acceptance and closeout; liquidated damages; <br /> incentives (if any); and warrantees/guarantees. <br /> It is assumed that 2 drafts and one final RFP will be prepared and that the Consultant will attend up <br /> to two meetings in Everett to discuss comments on the RFP drafts. In addition, it is assumed that <br /> the City will develop a set of contract documents for Progressive Design-Build with technical input <br /> from the Consultant. Legal counsel is outside the scope of this agreement. It is also assumed that <br /> the City will administer the advertisement and bid period process. The scope includes attendance at <br /> one pre-bid meeting by the Consultant and support in preparing one addendum responding to <br /> proposer questions. To the extent that technical support is required (such as geotechnical support <br /> or input from materials specialty firms);this work will be considered additional services (Task 7). <br /> The Consultant will review and provide input to the City on Proposals with specific focus on: 1)any <br /> proposers who appear to have failed to meet proposal submittal requirements; 2) demonstrated <br /> ability to meet the RFP criteria; and 3) commercial or technical concerns raised by respondents. <br /> Consultant comments on each proposal will be provided in matrix form to the City. The scope <br /> assumes up to 3 proposals will be submitted and reviewed by the Consultant. The scope further <br /> assumes that the Consultant will attend up to two meetings in Everett to support the City's proposal <br /> review team, and that the City will take the lead in interviewing proposers. <br /> Deliverables: <br /> • Preliminary draft, draft and final Progressive Design-Build RFP <br /> • Up to one RFP addendum <br /> • Up to 3 proposal review matrices <br /> • Five meetings in Everett(one pre-bid meeting,two during RFP preparation;two during <br /> proposal reviews/ interviews) <br /> Task 6 Additional Services, FEE=$15,045 <br /> Task 4 is a $15,045 budget reserve to provide additional support as requested by the City. Consultant <br /> will utilize the budget contained in Task 7 only upon written direction from the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.