Laserfiche WebLink
I1 Additional bridge scupper grates shall be procured by the Contractor. The additional <br /> 2 bridge scupper grates are to be delivered to the following address and will become the <br /> I 3 property of the City of Everett: <br /> 4 <br /> 5 4015 Railway Ave <br /> ' 6 Everett, WA 98201 <br /> 7 <br /> 8 The Contractor shall coordinate with the Engineer before delivering the additional grates <br /> 9 to the site. <br /> I10 <br /> 11 7-01.4.DOCX <br /> 12 Measurement <br /> I <br /> 13 <br /> 14 7-01.4.I NST1.DOCX <br /> 15 Section 7-01.4 is supplemented with the following: <br /> I 16 <br /> 17 7-01.4.OPT1.DOCX <br /> I <br /> 18 (******) <br /> 19 Heavy duty bridge scupper will be measured per each. <br /> 20 <br /> I 21 Additional bridge scupper grates will be measured per each. <br /> 22 <br /> 23 7-01.5.DOCX <br /> I 24 Payment <br /> 25 <br /> 26 7-01.5.INST1.DOCX <br /> I 27 Section 7-01.5 is supplemented with the following: <br /> 28 <br /> 29 7-01.5.OPT1.DOCX <br /> I30 (******) <br /> 31 "Heavy Duty Bridge Scupper", per each. <br /> 32 The unit contract price for"Heavy Duty Bridge Scupper" shall be full pay for all labor, tools, <br /> I33 equipment, and materials necessary to complete the work as specified, including bridge <br /> 34 scupper, pipe coupler, connection to drainage system with pipe coupler, cleaning, testing, <br /> 35 installation of new curb and slab, including concrete and steel reinforcing bar, and any <br /> I 36 salvaging and reinstalling of sidewalk panels required to complete the work. <br /> 37 <br /> 38 "Additional Bridge Scupper Grates", per each. <br /> I 39 The unit contract price for "Additional Bridge Scupper Grates" shall be full pay for <br /> 40 procurement of the grates and all labor, tools, and equipment necessary to deliver the <br /> 41 materials to the specified stockpile location. <br /> 42 <br /> 43 7-04.DOCX <br /> 44 Storm Sewers <br /> I <br /> 45 <br /> 46 7-04 2.DOCX <br /> 47 Materials <br /> 48 <br /> 49 7-04.2.INSTI.DOCX <br /> 50 Section 7-04.2 is supplemented with the following: <br /> 51 <br /> I <br /> I MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 93 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />