My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 Additional bridge scupper grates shall be procured by the Contractor. The additional <br /> 2 bridge scupper grates are to be delivered to the following address and will become the <br /> I 3 property of the City of Everett: <br /> 4 <br /> 5 4015 Railway Ave <br /> ' 6 Everett, WA 98201 <br /> 7 <br /> 8 The Contractor shall coordinate with the Engineer before delivering the additional grates <br /> 9 to the site. <br /> I10 <br /> 11 7-01.4.DOCX <br /> 12 Measurement <br /> I <br /> 13 <br /> 14 7-01.4.I NST1.DOCX <br /> 15 Section 7-01.4 is supplemented with the following: <br /> I 16 <br /> 17 7-01.4.OPT1.DOCX <br /> I <br /> 18 (******) <br /> 19 Heavy duty bridge scupper will be measured per each. <br /> 20 <br /> I 21 Additional bridge scupper grates will be measured per each. <br /> 22 <br /> 23 7-01.5.DOCX <br /> I 24 Payment <br /> 25 <br /> 26 7-01.5.INST1.DOCX <br /> I 27 Section 7-01.5 is supplemented with the following: <br /> 28 <br /> 29 7-01.5.OPT1.DOCX <br /> I30 (******) <br /> 31 "Heavy Duty Bridge Scupper", per each. <br /> 32 The unit contract price for"Heavy Duty Bridge Scupper" shall be full pay for all labor, tools, <br /> I33 equipment, and materials necessary to complete the work as specified, including bridge <br /> 34 scupper, pipe coupler, connection to drainage system with pipe coupler, cleaning, testing, <br /> 35 installation of new curb and slab, including concrete and steel reinforcing bar, and any <br /> I 36 salvaging and reinstalling of sidewalk panels required to complete the work. <br /> 37 <br /> 38 "Additional Bridge Scupper Grates", per each. <br /> I 39 The unit contract price for "Additional Bridge Scupper Grates" shall be full pay for <br /> 40 procurement of the grates and all labor, tools, and equipment necessary to deliver the <br /> 41 materials to the specified stockpile location. <br /> 42 <br /> 43 7-04.DOCX <br /> 44 Storm Sewers <br /> I <br /> 45 <br /> 46 7-04 2.DOCX <br /> 47 Materials <br /> 48 <br /> 49 7-04.2.INSTI.DOCX <br /> 50 Section 7-04.2 is supplemented with the following: <br /> 51 <br /> I <br /> I MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 93 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.