My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 7-04.2.OPTI.DOCX <br /> 2 (******) <br /> 3 Ductile Iron Pipe Class 52 9-05.13 <br /> 4 <br /> 5 7-04.3.DOCX <br /> 6 Construction Requirements <br /> 7 <br /> 8 7-04.3.INST1.DOCX <br /> 9 Section 7-04.3 is supplemented with the following: <br /> 10 <br /> 11 7-04.3.OPT1.DOCX <br /> 12 (******) <br /> 13 Ductile iron pipes and fittings shall be joined with flanged or restrained joints. Pipes shall <br /> 14 be connected to bridge drains with couplers. <br /> 15 <br /> 16 7-04.4.DOCX <br /> 17 Measurement <br /> 18 <br /> 19 7-04.4.INST1.DOCX <br /> 20 Section 7-04.4 is supplemented with the following: I <br /> 21 <br /> 22 7-04.4.OPTI.DOCX <br /> 23 (******) <br /> 24 Pipe fittings will be measured per each. <br /> 25 111 <br /> 26 7-04.5.DOCX <br /> 27 Payment <br /> 28 <br /> 29 7-04.5.INST1.DOCX <br /> 30 Section 7-04.5 is supplemented with the following: <br /> 31 <br /> 32 7-04.5 OPT1.DOCX <br /> 33 (******) <br /> 34 The unit contract price per lineal foot for Solid Wall PVC Storm Sewer Pipe 8 In. Diam. <br /> 35 shall be full pay for all Work to complete installation, including adjustment of inverts to <br /> 36 manholes and furnishing and installing a tee and coupler connection to existing pipe. <br /> 37 <br /> 38 "Ductile Iron Storm Sewer Pipe In. Diam.", per linear foot. <br /> 39 The unit Contract price per linear foot for the storm sewer pipe of the kind and size <br /> 40 specified shall be full pay for all Work to complete the installation including, but not limited I <br /> 41 to pipe bedding, pipe, cleaning and testing, property restoration, providing and installing <br /> 42 couplers and hanger assemblies, and any labor, materials and equipment required for <br /> 43 backfill of the pipe zone. <br /> 44 <br /> 45 "8 In. Diam. Ductile Iron WYE", per each. <br /> 46 "8 In. Diam. Ductile Iron 45 Degree Bend", per each. <br /> 47 "8 In. Diam. Ductile Iron 22.5 Degree Bend", per each. <br /> 48 "8 In. Diam. Ductile Iron Cap", per each. <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 94 OF 106 SPECIAL PROVISIONS—Addendum 1 I <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.