My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The unit Contract price per each for the pipe fittings of the kind and size specified shall <br /> 2 be full pay for all Work to furnish and install fittings including but not limited to cleaning, <br /> ' 3 testing, and joining with restrained or flanged joints. <br /> 4 <br /> 5 7-05.DOCX <br /> 6 Manholes, Inlets, Catch Basins, and Drywells <br /> 7 <br /> 8 7-05.3.DOCX <br /> 9 Construction Requirements <br /> 10 <br /> 11 7-05.3.I NST1.DOCX <br /> 12 Section 7-05.3 is supplemented with the following: <br /> 13 <br /> 14 7-05.3.OPT1.DOCX <br /> 15 (******) <br /> 16 Floatable Material Separator <br /> 17 Floatable material separators shall be constructed in accordance with COE Standard Plan <br /> 18 #413. <br /> 19 <br /> 20 7-05.4.DOCX <br /> 21 Measurement <br /> 22 <br /> 23 7-05.4.INST1.DOCX <br /> ' 24 Section 7-05.4 is supplemented with the following: <br /> 25 <br /> 26 7-05.4.OPT1.DOCX <br /> 27 (******) <br /> 28 Floatable material separator will be measured per each. <br /> I 29 <br /> 30 7-05.5.DOCX <br /> 31 Payment <br /> ' 32 <br /> 33 7-05.5.INSTI.DOCX <br /> 34 Section 7-05.5 is supplemented with the following: <br /> ' 35 <br /> 36 7-05.5.OPT1 DOCX <br /> 37 (******) <br /> 38 "Floatable Material Separator In. Diam." Per each. <br /> 39 The unit Contract price per each for "Floatable Material Separator" shall be full <br /> ' 40 compensation for all labor, materials, and Equipment necessary to complete the <br /> 41 installation. <br /> 42 <br /> 43 DIVISION8.GR8 <br /> ' 44 Division 8 <br /> 45 Miscellaneous Construction <br /> 46 <br /> ' 47 8-02.GR8 <br /> 48 Roadside Restoration <br /> 49 <br /> i <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 95 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.