My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 All references to "State Materials Laboratory" shall be revised to read "Contracting <br /> 2 Agency designated location". <br /> I 3 <br /> 4 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 5 Contracting Agency form(s) by which final payment is authorized, and final completion <br /> I 6 and acceptance granted. <br /> 7 <br /> 8 Additive <br /> 9 A supplemental unit of work or group of bid items, identified separately in the Bid <br /> I10 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition <br /> 11 to the base bid. <br /> 12 <br /> I 13 Alternate <br /> 14 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 15 Proposal, from which the Contracting Agency may make a choice between different <br /> I 16 methods or material of construction for performing the same work. <br /> 17 <br /> 18 Business Day <br /> I 19 A business day is any day from Monday through Friday except holidays as listed in <br /> 20 Section 1-08.5. <br /> 21 <br /> 22 Contract Bond <br /> I23 The definition in the Standard Specifications for "Contract Bond" applies to whatever <br /> 24 bond form(s) are required by the Contract Documents, which may be a combination of a <br /> 25 Payment Bond and a Performance Bond. <br /> I 26 <br /> 27 Contract Documents <br /> 28 See definition for"Contract". <br /> I 29 <br /> 30 Contract Time <br /> 31 The period of time established by the terms and conditions of the Contract within which <br /> 32 the Work must be physically completed. <br /> 33 <br /> 34 Notice of Award <br /> I 35 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> 36 Contracting Agency's acceptance of the Bid Proposal. <br /> 37 <br /> 38 Notice to Proceed <br /> I39 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> 40 and directing the Contractor to proceed with the Work and establishing the date on which <br /> 41 the Contract time begins. <br /> 111 <br /> 42 <br /> 43 Traffic <br /> 44 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> 1 45 equestrian traffic. <br /> 46 <br /> I <br /> I <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 3 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4, 2020 FEDERAL AID#BHM-2776(008) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.