My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1-02.1.RTF , <br /> 2 1-02 BID PROCEDURES AND CONDITIONS <br /> 3 <br /> 4 1-02.1 Prequalification of Bidders <br /> 5 <br /> 6 Delete this section and replace it with the following: <br /> 7 <br /> 8 1-02.1 Qualifications of Bidder <br /> 9 (January 24, 2011 APWA GSP) <br /> 10 <br /> 11 Before award of a public works contract, a bidder must meet at least the minimum <br /> 12 qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to <br /> 13 be awarded a public works project. <br /> 14 <br /> 15 1-02.2.RTF.DOCX <br /> 16 1-02.2 Plans and Specifications <br /> 17 (June 27, 2011 APWA GSP) <br /> 18 <br /> 19 Delete this section and replace it with the following: <br /> 20 <br /> 21 Information as to where Bid Documents can be obtained or reviewed can be found in the <br /> 22 Call for Bids (Advertisement for Bids) for the work. <br /> 23 <br /> 24 After award of the contract, plans and specifications will be issued to the Contractor at no <br /> 25 cost as detailed below: <br /> 26 1 <br /> To Prime Contractor No. of Sets Basis of Distribution <br /> Reduced plans (11" x 17") 4 Furnished automatically I <br /> upon award. <br /> Contract Provisions 3 Furnished automatically <br /> upon award. <br /> Large plans (e.g., 22" x 2 Furnished only upon <br /> 34") request. <br /> 27 <br /> 28 Additional plans and Contract Provisions may be obtained by the Contractor from the <br /> 29 source stated in the Call for Bids, at the Contractor's own expense. <br /> 30 <br /> 31 1-02.4.GR1 I <br /> 32 Examination of Plans, Specifications and Site of Work <br /> 33 <br /> 34 1-02.4(1).GR1 I <br /> 35 General <br /> 36 <br /> 37 1-02.4(1),INST1.GR1 <br /> 111 <br /> 38 Section 1-02.4(1) is supplemented with the following: <br /> 39 <br /> 40 1-02.4(1).OPT1.FR1.DOCX <br /> 41 (September 3, 2019) <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 4 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.