My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-02.3(11).GR8 <br /> 2 Mulch <br /> 3 <br /> 4 8-02.3(11)B.DOCX <br /> 5 Bark or Woodchip Mulch <br /> 6 <br /> 7 8-02.3(11)B.INST1.DOCX <br /> 8 Section 8-02.3(11)B is supplemented with the following: <br /> 9 <br /> 10 8-02.3(11)B.OPT1.DOCX <br /> 11 (******) <br /> 12 A 6" depth of hog fuel mulch shall be applied to the lawn staging area for I <br /> 13 temporary vehicular use (removed by contractor after temporary use) and as <br /> 14 separately applied to the northwest bridge abutment access route (left in place <br /> 15 after use) as noted in Plans. <br /> 16 <br /> 17 8-02.4.GR8 <br /> 18 Measurement <br /> 19 <br /> 20 8-02.4.INST1.DOCX <br /> 21 The first sentence of Section 8-02.4 is revised to read: <br /> 22 <br /> 23 8-02.4.OPT1.DOCX <br /> 24 (******) <br /> 25 Topsoil, bark, or woodchip mulch and soil amendments will be measured by the acre, the <br /> 26 cubic yard in the haul conveyance at the point of delivery, or the square yard along the I <br /> 27 grade and slope of the area covered immediately after placement. <br /> 28 <br /> 29 8-02.5.GR8 <br /> 30 Payment <br /> 31 <br /> 32 8-02.5.INST1.GR8 <br /> 33 Section 8-02.5 is supplemented with the following: <br /> 34 <br /> 35 8-02.5.OPT1.DOCX <br /> 36 (******) <br /> 37 "Fine Compost and Tilling", per square yard. <br /> 38 The unit Contract price per square yard for "Fine Compost and Tilling" shall be full I <br /> 39 compensation for furnishing and incorporating the compost. <br /> 40 <br /> 41 "Lawn Establishment", Lump Sum. <br /> 42 <br /> 43 "Bark or Wood Chip Mulch", per cubic yard. <br /> 44 <br /> 45 8-03.DOCX <br /> 46 Irrigation Systems <br /> 47 ' <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 102 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.