My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I CITY OF EVERETT, WASHINGTON <br /> CONTRACT PROVISIONS FOR <br /> MAPLE HEIGHTS SEISMIC RETROFIT -W.O. #3693 <br /> IFEDERAL AID # BHM-2776(008) <br /> BID PROPOSAL <br /> INote: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs <br /> between the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be <br /> corrected to conform thereto. All entries must be typed or entered in ink. <br /> IBIDDER NAME <br /> BASIC BID ITEMS <br /> 1 ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> I 1. 1 $ $ <br /> MOBILIZATION • <br /> Lump Sum Per L.S. <br /> I2. 1 $ $ , <br /> CLEARING AND GRUBBING <br /> Lump Sum Per L.S. <br /> I <br /> 3. 109 REMOVING EXISTING $ . $ . <br /> ILinear Foot DRAINAGE PIPE Per L.F. <br /> 4. 6 REMOVING DRAINAGE $ . $ . <br /> IEach STRUCTURE Per EACH <br /> 5. 1 REMOVAL OF STRUCTURES $ . $ <br /> ILump Sum AND OBSTRUCTIONS Per L.S. <br /> 6. 6 HEAVY DUTY BRIDGE $ . $ <br /> IEach SCUPPER Per EACH <br /> I 7. 3 ADDITIONAL BRIDGE $ . $ . <br /> Each SCUPPER GRATES Per EACH <br /> l <br /> 8. 6 SOLID WALL PVC STORM $ $ <br /> Linear Foot SEWER PIPE 8 IN. DIAM. Per L.F. <br /> I 9. 93 DUCTILE IRON STORM $ $ <br /> Linear Foot SEWER PIPE 8 IN. DIAM. Per L.F. <br /> I10. 7 8 IN. DIAM DUCTILE IRON $ $ <br /> Each WYE Per EACH <br /> I <br /> I MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 2 OF 15 BID PROPOSAL-Addendum#1 <br /> WORK ORDER#3693 June 2,2020 FEDERAL AID#BHM-272(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.