Laserfiche WebLink
1 Payment I <br /> 2 Payment will be made for the following bid item when included in the proposal: <br /> 3 <br /> 4 "Rock Slope Protection", lump sum. <br /> 5 <br /> 6 The work required for the furnishing and installing gabions, including but not limited to: I <br /> 7 excavating the foundation, removing and replacing unsuitable foundation soils, fabrication of <br /> 8 baskets, filling baskets, unit weight testing, cribbing erection, and shaping of the slope will be <br /> 9 considered incidental to the bid item cost for"Rock Slope Protection". <br /> 10 <br /> 11 8-SA2.DOCX <br /> 12 (******) I <br /> 13 REPAIR OF ANTICIPATED DAMAGE TO SIDEWALKS, CURBS, AND GUTTERS <br /> 14 Description ' <br /> 15 This work shall consist of repairing curbs, sidewalks, and other facilities that are damaged as <br /> 16 a result of construction loading as directed by the Engineer. <br /> 17 1 18 Materials <br /> 19 Materials shall meet the requirements of the following sections: <br /> 20 Cement 9-01 I <br /> 21 Aggregates 9-03 <br /> 22 Premolded Joint Filler 9-04.1 <br /> 23 Reinforcing Steel 9-07 <br /> 24 Concrete Curing Materials and Admixtures 9-23 <br /> 25 <br /> 26 Construction Requirements I <br /> 27 When instructed by the Engineer, portions of damaged sidewalk, curbs, and gutters shall be <br /> 28 removed per the requirements in Section 2-02.3(3) of the Standard Specifications. <br /> 39 I 30 New sidewalks shall be constructed per the requirements in Section 3.17 of the City of Everett <br /> 31 Design and Construction Standards and Specifications. <br /> 32 <br /> 33 New curbs and gutters shall be constructed per the requirements in Section 3.18 of the City I <br /> 34 of Everett Design and Construction Standards and Specifications. <br /> 35 <br /> 36 Unless otherwise specified by the Engineer, the work will be restricted to the west approach 1 <br /> 37 of the bridge near the proposed staging area shown in the Plans and the west end of the <br /> 38 bridge. <br /> 39 <br /> 40 Payment <br /> 41 Payment will be made for the following bid item when included in the proposal: <br /> 42 I 43 "Repair of Anticipated Damage to Sidewalks, Curbs, and Gutters", will be paid per force <br /> 44 account in accordance with Section 1-09.6. <br /> 45 I 46 For the purpose of providing a common Proposal for all Bidders, the Contracting Agency has <br /> 47 entered an amount for "Repair of Anticipated Damage to Sidewalks, Curbs, and Gutters" in <br /> 48 the Proposal to become a part of the total Bid by the Contractor. <br /> 49 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 106 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />