My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> 11 NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> I 11. 7 8 IN. DIAM DUCTILE IRON 45 $ $ <br /> Each DEGREE BEND Per EACH <br /> I 12. 10 8 IN. DIAM DUCTILE IRON $ $ <br /> Each 22.5 DEGREE BEND Per EACH <br /> I13. 2 8 IN. DIAM DUCTILE IRON $ • $ . <br /> Each CAP Per EACH <br /> I14. 1 8 IN. FLOATABLE MATERIAL $ . $ <br /> Each SEPARATOR Per EACH <br /> I15. 1 SEISMIC RETROFIT- MAPLE $ • $ . <br /> Lump Sum HEIGHTS BRIDGE Per L.S. <br /> I16. 1 CLEANING AND ANTI- $ • $ . <br /> Lump Sum GRAFFITI COATING Per L.S. <br /> I 17. 1 IRRIGATION SYSTEM $ $ <br /> Lump Sum COMPLETE Per L.S. <br /> 18. 10 . <br /> INLET PROTECTION $ $ <br /> IEach Per EACH <br /> 19. 140 $ • $ <br /> WATTLE <br /> ILinear Foot Per L.F. <br /> 20. 1 EROSION/WATER $ 5,000 . 00 $ 5,000 . 00 <br /> IEstimate POLLUTION CONTROL Per EST. <br /> 21. 1,584 $ • $FINE COMPOST AND TILLING <br /> ISquare Yard Per S.Y. <br /> 22. 1 I LAWN ESTABLISHMENT $ $ <br /> Lump Sum Per L.S. <br /> 23. 283 BARK OR WOOD CHIP $ $ . <br /> Cubic Yard MULCH Per C.Y. <br /> I 24. 1,434 SEEDED LAWN $ $ <br /> Square Yard INSTALLATION Per S.Y. <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 3 OF 15 BID PROPOSAL-Addendum#1 <br /> I WORK ORDER#3693 June 2,2020 FEDERAL AID#BHM-272(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.