Laserfiche WebLink
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) 1 <br /> 25. 160 $ •HIGH VISIBILITY SILT FENCE $ • <br /> Linear Foot Per L.F. <br /> 26. 1 PROJECT TEMPORARY $ • $ • <br /> Lump Sum TRAFFIC CONTROL Per L.S. <br /> 27. 4 STRUCTURE EXCAVATION $ • $ • <br /> Cubic Yard CLASS B INCL. HAUL Per C.Y. <br /> 28. 1 I$ •STRUCTURE SURVEYING $ • <br /> Lump Sum Per L.S. <br /> 29. 510 TEMPORARY CHAIN LINK $ • $ . I <br /> Linear Foot FENCE Per L.F. <br /> 30. 2 CONNECTION TO DRAINAGE $ • $ . I <br /> Each STRUCTURE Per EACH <br /> 31. 1 ROADSIDE CLEANUP $ 10,000 . 00 $ 10,000. 00 <br /> Force Account Per F.A. <br /> 32. 1 REIMBURSEMENT FOR THIRD $ 10,000 . 00 $ 10,000. 00 <br /> Estimate PARTY DAMAGE Per EST. <br /> 33. 1 MINOR CHANGE $ 15,000 . 00 $ 15,000. 00 <br /> Calculated Per CALC <br /> 34. 1 $SPCC PLAN • $ I Lump Sum Per L.S. <br /> 35. 1 $ •HEALTH AND SAFETY PLAN $ I Lump Sum Per L.S. <br /> 36. 1 FA-SITE CLEANUP OF BIO. $ 10,000 . 00 $ 10,000. 00 <br /> Force Account AND PHYSICAL HAZARDS Per F.A. <br /> 37. 1 $ •ROCK SLOPE PROTECTION $ I Lump Sum Per L.S. <br /> 38. 1 REPAIR OF ANTICIPATED $ 30,000 . 00 $ 30,000. 00 <br /> Force Account DAMAGE TO SIDEWALKS, Per F.A. <br /> CONTRACT I <br /> $ . <br /> TOTAL <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 4 OF 15 BID PROPOSAL-Addendum#1 <br /> WORK ORDER#3693 June 2,2020 FEDERAL AID#BHM-272(008) <br />