My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I in <br /> ' EVE RETT <br /> CITY OF EVERETT, WASHINGTON <br /> I WASHINGTON PUBLIC WORKS DEPARTMENT <br /> ADDENDUM NO. 2 <br /> Maple Heights Bridge Seismic Retrofit <br /> I PW 3693 <br /> Federal Aid# BHM-2776(008) <br /> June 2, 2020 <br /> I No <br /> tice to Planholders: <br /> IThis Addendum No. 2 contains the following clarifications, is hereby made <br /> a part of the plans and specifications (Contract Documents) for the above <br /> named project, and shall be taken into consideration by Bidders in <br /> Isubmitting their bids. <br /> Bidders shall acknowledge receipt of this Addendum No. 2 in the space <br /> I provided on the Proposal. Failure to do so may subject the Bidder to <br /> disqualification of its bid. <br /> ICLARIFICATIONS <br /> Drainage: <br /> I1. Does this mean an MJXFLG Adapter is permitted as long as it is <br /> restrained? <br /> IYes, this is permitted. <br /> 2. Could you please provide spool lengths for the ductile iron <br /> running north and south? <br /> IPer section A-A on sheet C3, North/South run is 50 LF. <br /> 3. I don't see a spec for any type of special coatings on the ductile <br /> I pipe. Is ductile to be coated with the standard bituminous tar <br /> coating? <br /> No special coating is required, and the standard bituminous <br /> coating is acceptable. <br /> I <br /> Structure: <br /> itivp <br /> UBLIC WORKS <br /> 4. I don't see a bid item for the expansion joint replacement. Can <br /> 3200 Cedar Street you add one, or let me know what item that work is incidental to? <br /> Everett, WA 98201 The Expansion Joint (incl. removal of exist. Expansion Joint), 50 <br /> 425.257.880o L.F., will be incidental to Seismic Retrofit—Maple Heights Bridge, <br /> 425.257.8882ax Lump Sum. <br /> ,;; everettpvgeverettwa.gov <br /> • everettwa.goyow <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.