My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anti-graffiti: <br /> 5. Does the contract require all 7 girders be cleaned and anti-graffiti paint applied to both <br /> Spans 1 and 3? <br /> Per Special: <br /> "This work shall consist of cleaning and applying anti-graffiti coating to affected areas of <br /> the existing bridge structure, including the East and West Abutments, Piers 1 and 2, and <br /> Span 1 and 3 girders. The work shall also consist of applying anti-graffiti coating to all <br /> exposed surfaces of the new concrete catcher blocks." <br /> This will include all girders for Spans 1 and 3. 1 <br /> 6. Will columns, pile caps, & diaphragms all need coating, please clarify anti-graffiti limits? <br /> For Span 1 and 3 the intermediate diaphragms are included. For the piers only the piles <br /> are graffitied, the pier caps and diaphragms above the piles are clear. <br /> 7. Is the contractor allowed to sandblast the graffiti off prior to rinsing and painting? <br /> Sandblasting shall not be allowed; graffiti removal is expected to be accomplished by <br /> chemical removal. <br /> All other requirements of the plans and specifications remain in effect. I <br /> This addendum shall be attached to and made a part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> Sincerely, I <br /> t 1 <br /> Gael L. Fisk, P.E. <br /> Project Engineer <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Page 2 of 2 <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.