My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT, WASHINGTON <br /> CONTRACT PROVISIONS <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT <br /> WORK ORDER #3693 <br /> FEDERAL AID #BHM-2776(008) <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> Project Manager: Gael L. Fisk, P.E. <br /> (425) 257-8909 <br /> r • <br /> "ItiMMiab <br /> 3 .. <br /> • <br /> QT�' •' Q 25801 •C`j�' <br /> ojsr8 <br /> NA.. � �.� j IS T0 •.• G <br /> ONA V <br /> 05/04/2020 S"t4 26}' ` <br /> Khashayar Nikzad, P.E. Ryan L. Sass, P.E. <br /> Project Engineer Public Works Director <br /> I <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.