Laserfiche WebLink
I <br /> 1 1-07.18(5)D Excess or Umbrella Liability 57 <br /> I2 1-07.18(5)E LHWCA Insurance 57 <br /> 3 1-07.18(5)J Pollution Liability 58 <br /> I4 1-07.18(5)K Professional Liability 58 <br /> 5 1-07.23 Public Convenience and Safety 58 <br /> I6 1-07.23(1) Construction Under Traffic 59 <br /> 7 1-07.24 Rights of Way 61 <br /> I 8 1-08 PROSECUTION AND PROGRESS 62 <br /> 9 1-08.0 Preliminary Matters 62 <br /> I 10 1-08.0(1) Preconstruction Conference 63 <br /> 11 1-08.0(2) Hours of Work 63 <br /> 12 1-08.1 Subcontracting 64 <br /> I13 1-08.3 Progress Schedule 65 <br /> 14 1-08.3(2) Progress Schedule Types 65 <br /> I15 1-08.4 Notice to Proceed and Prosecution of Work 65 <br /> 16 1-08.5 Time for Completion 66 <br /> I17 1-08.9 Liquidated Damages 67 <br /> 18 1-09 MEASUREMENTAND PAYMENT 67 <br /> I19 1-09.2(1) General Requirements for Weighing Equipment 67 <br /> 20 1-09.2(5) Measurement 68 <br /> I 21 1-09.6 Force Account 68 <br /> 22 1 09.9 Payments 68 <br /> 23 1-09.9(1) Retainage 69 <br /> I24 1-09.11 Disputes and Claims 69 <br /> 25 1-09.11(3) Time Limitation and Jurisdiction 80 <br /> 1 26 1-10 TEMPORARY TRAFFIC CONTROL 81 <br /> 27 1-10.2 Traffic Control Management 81 <br /> I28 1-10.2(1) General 81 <br /> 29 1-10.4 Measurement 81 <br /> 1 30 1-10.4(1) Lump Sum Bid for Project (No Unit Items) 81 <br /> 31 DIVISION 2 <br /> I32 EARTHWORK <br /> 33 2-01 CLEARING, GRUBBING, AND ROADSIDE CLEANUP 82 <br /> I 34 2-01.1 Description 82 <br /> 35 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 82 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 3 OF 5 TOC-SPECIAL PROVISIONS <br /> IWORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />