My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-07.18(5)D Excess or Umbrella Liability 57 <br /> I2 1-07.18(5)E LHWCA Insurance 57 <br /> 3 1-07.18(5)J Pollution Liability 58 <br /> I4 1-07.18(5)K Professional Liability 58 <br /> 5 1-07.23 Public Convenience and Safety 58 <br /> I6 1-07.23(1) Construction Under Traffic 59 <br /> 7 1-07.24 Rights of Way 61 <br /> I 8 1-08 PROSECUTION AND PROGRESS 62 <br /> 9 1-08.0 Preliminary Matters 62 <br /> I 10 1-08.0(1) Preconstruction Conference 63 <br /> 11 1-08.0(2) Hours of Work 63 <br /> 12 1-08.1 Subcontracting 64 <br /> I13 1-08.3 Progress Schedule 65 <br /> 14 1-08.3(2) Progress Schedule Types 65 <br /> I15 1-08.4 Notice to Proceed and Prosecution of Work 65 <br /> 16 1-08.5 Time for Completion 66 <br /> I17 1-08.9 Liquidated Damages 67 <br /> 18 1-09 MEASUREMENTAND PAYMENT 67 <br /> I19 1-09.2(1) General Requirements for Weighing Equipment 67 <br /> 20 1-09.2(5) Measurement 68 <br /> I 21 1-09.6 Force Account 68 <br /> 22 1 09.9 Payments 68 <br /> 23 1-09.9(1) Retainage 69 <br /> I24 1-09.11 Disputes and Claims 69 <br /> 25 1-09.11(3) Time Limitation and Jurisdiction 80 <br /> 1 26 1-10 TEMPORARY TRAFFIC CONTROL 81 <br /> 27 1-10.2 Traffic Control Management 81 <br /> I28 1-10.2(1) General 81 <br /> 29 1-10.4 Measurement 81 <br /> 1 30 1-10.4(1) Lump Sum Bid for Project (No Unit Items) 81 <br /> 31 DIVISION 2 <br /> I32 EARTHWORK <br /> 33 2-01 CLEARING, GRUBBING, AND ROADSIDE CLEANUP 82 <br /> I 34 2-01.1 Description 82 <br /> 35 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 82 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 3 OF 5 TOC-SPECIAL PROVISIONS <br /> IWORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.