Laserfiche WebLink
1 <br /> 1 2-02.3 Construction Requirements 82 <br /> 2 2-02.3(2) Removal of Bridges, Box Culverts, and other Drainage Structures-82I <br /> 3 2-02.4 Measurement 83 <br /> 4 2-02.5 Payment 83111 <br /> 5 DIVISION 6 <br /> 6 STRUCTURES I <br /> 7 6-02 CONCRETE STRUCTURES 84 <br /> 8 6-02.2 Materials 84 <br /> 11 <br /> 9 6-02.2(9-08) Paints and Related Materials 87 <br /> 10 6-02.3 Construction Requirements 89 <br /> 11 6-02.3(13) Expansion Joints 90 <br /> 12 6-02.3(24) Reinforcement 92 <br /> 13 6-02.3(24)C Placing and Fastening 92 <br /> 14 6-02.4 Measurement 93 <br /> 15 6-02.5 Payment 93 I <br /> 16 DIVISION 7 <br /> 17 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY I <br /> 18 SEWERS, WATER MAINS, AND CONDUITS <br /> 19 7-01 DRAINS 94 '1 <br /> 20 7-01.1 Description 94 <br /> 21 7-01.2 Materials 94 1 <br /> 22 7-01.3 Construction Requirements 94 <br /> 23 7-01.4 Measurement 95 <br /> 24 7-01.5 Payment 95 <br /> 25 7-04 STORM SEWERS 95 <br /> 26 7-04.2 Materials 95 <br /> 27 7-04.3 Construction Requirements 95 <br /> 28 7-04.4 Measurement 96 <br /> 29 7-04.5 Payment 96 <br /> 30 DIVISION 8 1 <br /> 31 MISCELLANEOUS CONSTRUCTION <br /> 32 8-02 ROADSIDE RESTORATION 97 1 <br /> 33 8-02.2 Materials 98 <br /> 34 8-02.2(9-14) Erosion Control and Roadside Planting 98111 <br /> 1 <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 4 OF 5 TOC-SPECIAL PROVISIONS <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />