My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 2-02.3 Construction Requirements 82 <br /> 2 2-02.3(2) Removal of Bridges, Box Culverts, and other Drainage Structures-82I <br /> 3 2-02.4 Measurement 83 <br /> 4 2-02.5 Payment 83111 <br /> 5 DIVISION 6 <br /> 6 STRUCTURES I <br /> 7 6-02 CONCRETE STRUCTURES 84 <br /> 8 6-02.2 Materials 84 <br /> 11 <br /> 9 6-02.2(9-08) Paints and Related Materials 87 <br /> 10 6-02.3 Construction Requirements 89 <br /> 11 6-02.3(13) Expansion Joints 90 <br /> 12 6-02.3(24) Reinforcement 92 <br /> 13 6-02.3(24)C Placing and Fastening 92 <br /> 14 6-02.4 Measurement 93 <br /> 15 6-02.5 Payment 93 I <br /> 16 DIVISION 7 <br /> 17 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY I <br /> 18 SEWERS, WATER MAINS, AND CONDUITS <br /> 19 7-01 DRAINS 94 '1 <br /> 20 7-01.1 Description 94 <br /> 21 7-01.2 Materials 94 1 <br /> 22 7-01.3 Construction Requirements 94 <br /> 23 7-01.4 Measurement 95 <br /> 24 7-01.5 Payment 95 <br /> 25 7-04 STORM SEWERS 95 <br /> 26 7-04.2 Materials 95 <br /> 27 7-04.3 Construction Requirements 95 <br /> 28 7-04.4 Measurement 96 <br /> 29 7-04.5 Payment 96 <br /> 30 DIVISION 8 1 <br /> 31 MISCELLANEOUS CONSTRUCTION <br /> 32 8-02 ROADSIDE RESTORATION 97 1 <br /> 33 8-02.2 Materials 98 <br /> 34 8-02.2(9-14) Erosion Control and Roadside Planting 98111 <br /> 1 <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 4 OF 5 TOC-SPECIAL PROVISIONS <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.