My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 8-02.2(9-14.4) Fertilizer 98 <br /> 2 8-02.2(9-14.5) Mulch and Amendments 98 <br /> 3 8-02.2(9-14.5(2)) Hydraulically Applied Erosion <br /> I4 Control Products (HECPs) 98 <br /> 5 8-02.2(9-14.5(3)) Bark or Wood Chip Mulch 99 <br /> I6 8-02.2(9-14.5(4)) Wood Strand Mulch 100 <br /> 7 8-02.2(9-14.5(7)) Tackifier 100 <br /> I 8 8-02.2(9-14.5(8)) Compost 100 <br /> 9 8-02.3 Construction Requirements 102 <br /> 10 8-02.3(5) Roadside Seeding, Lawn and Planting Area Preparation 102 <br /> 11 8-02.3(5)B Lawn Area Preparation 102 <br /> 12 8-02.3(10) Lawn Installation 103 <br /> I13 8-02.3(10)B Lawn Seeding and Sodding 103 <br /> 14 8-02.3(10)C Lawn Establishment 103 <br /> III15 8-02.3(11) Mulch 104 <br /> 16 8-02.3(11)B Bark or Woodchip Mulch 104 <br /> 1 17 8-02.4 Measurement 104 <br /> 18 8-02.5 Payment 104 <br /> I19 8-03 IRRIGATION SYSTEMS 105 <br /> 20 8-03.1 Description 105 <br /> I 21 8-03.3 Construction Requirements 105 <br /> 22 8 03.5 Payment 105 <br /> I 23 8-12 CHAIN LINK FENCE AND WIRE FENCE 106 <br /> 24 8-12.1 Description 106 <br /> 25 8-12.3 Construction Requirements 106 <br /> I26 8-12.3(1) Chain Link Fence and Gates 106 <br /> 27 8-12.4 Measurement 107 <br /> I28 8-12.5 Payment 107 <br /> 29 8-SA1 ROCK SLOPE PROTECTION 107 <br /> i30 8-SA2 REPAIR OF ANTICIPATED DAMAGE TO SIDEWALKS, <br /> 31 CURBS,AND GUTTERS 108 <br /> I <br /> I <br /> I <br /> I MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 5 OF 5 TOC-SPECIAL PROVISIONS <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID# BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.