Laserfiche WebLink
1 1 <br /> 2 Operational and test periods, when required by the Engineer, shall not affect a <br /> 3 manufacturer's guaranties or warranties furnished under the terms of the contract. <br /> 4 <br /> 5 <br /> 6 1-05.13.RTF <br /> 7 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> 8 (August 14, 2013 APWA GSP) <br /> 9 <br /> 10 Delete the sixth and seventh paragraphs of this section. <br /> 11 <br /> 12 1-05.15.RTF <br /> 13 1-05.15 Method of Serving Notices <br /> 14 (March 25, 2009 APWA GSP) <br /> 15 Revise the second paragraph to read: 1 <br /> 16 <br /> 17 All correspondence from the Contractor shall be directed to the Project Engineer. All <br /> 18 correspondence from the Contractor constituting any notification, notice of protest, notice 1 <br /> 19 of dispute, or other correspondence constituting notification required to be furnished <br /> 20 under the Contract, must be in paper format, hand delivered or sent via mail delivery <br /> 21 service to the Project Engineer's office. Electronic copies such as e-mails or <br /> 22 electronically delivered copies of correspondence will not constitute such notice and will <br /> 23 not comply with the requirements of the Contract. <br /> 24 <br /> 25 1-05.16.RTF111 <br /> 26 Add the following new section: <br /> 27 <br /> 28 1-05.16 Water and Power <br /> 29 (October 1, 2005 APWA GSP) <br /> 30 <br /> 31 The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> 32 and water necessary for the performance of the work, unless the contract includes power <br /> 33 and water as a pay item. <br /> 34 <br /> 35 1-06.GR1 111 <br /> 36 Control of Material <br /> 37 <br /> 38 1-06.INST1.GR1 <br /> 39 Section 1-06 is supplemented with the following: <br /> 40 <br /> 41 1-06.OPT1.GR1 <br /> 42 Buy America <br /> 43 <br /> 44 1-06.OPT1(A).GR1 <br /> 45 (August 6, 2012) <br /> 46 In accordance with Buy America requirements contained in 23 CFR 635.410, the major <br /> 47 quantities of steel and iron construction material that is permanently incorporated into the 1 <br /> 48 project shall consist of American-made materials only. Buy America does not apply to <br /> 49 temporary steel items, e g., temporary sheet piling, temporary bridges, steel scaffolding <br /> 50 and falsework. <br /> 51 <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 16 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />