My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 continuously, and not be limited to normal working hours. The required or implied duty of <br /> 2 the Engineer to conduct construction review of the Contractor's performance does not, <br /> I 3 and shall not, be intended to include review and adequacy of the Contractor's safety <br /> 4 measures in, on, or near the project site. <br /> 5 <br /> I 6 <br /> 7 1-07.1.OPT3.FR1.DOCX <br /> 8 (April 3, 2006) <br /> I 9 Confined Space <br /> 10 Confined spaces are known to exist at the following locations: <br /> 11 <br /> 12 *** West abutment under the bridge superstructure *** <br /> 13 <br /> 14 The Contractor shall be fully responsible for the safety and health of all on-site workers <br /> 15 and compliant with Washington Administrative Code (WAC 296-809). <br /> i16 <br /> 17 The Contractor shall prepare and implement a confined space program for each of the <br /> 18 confined spaces identified above. The Contractors Confined Space program shall be <br /> I 19 sent to the Contracting Agency at least 30 days prior to the Contractor beginning work in <br /> 20 or adjacent to the confined space. No work shall be performed in or adjacent to the <br /> 21 confined space until the plan is submitted to the Engineer as required. The Contractor <br /> I 22 shall communicate with the Engineer to ensure a coordinated effort for providing and <br /> 23 maintaining a safe worksite for both the Contracting Agency's and Contractor's workers <br /> 24 when working in or near a confined space. <br /> I 25 <br /> 26 All costs to prepare and implement the confined space program shall be included in the <br /> 27 bid prices for the various items associated with the confined space work. <br /> 28 i 29 1 07.1.OPT4.GR1 <br /> 30 (April 6, 2020) <br /> 31 In response to COVID-19, the Contractor shall prepare a project specific COVID-19 health <br /> 111 32 and safety plan (CHSP) in conformance with Section 1-07.4(2) as supplemented in these <br /> 33 specifications, COVID-19 Health and Safety Plan (CHSP). A copy of the CHSP <br /> 34 developed by the Contractor shall be submitted to the Engineer as a Type 2 Working <br /> I 35 Drawing. <br /> 36 <br /> 37 1-07.2.RTF <br /> I 38 1-07.2 State Taxes <br /> 39 <br /> 40 Delete this section, including its sub-sections, in its entirety and replace it with the following: <br /> 1 41 <br /> 42 1-07.2 State Sales Tax <br /> 43 (June 27, 2011 APWA GSP) <br /> 44 <br /> I45 The Washington State Department of Revenue has issued special rules on the State <br /> 46 sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br /> 47 Contractor should contact the Washington State Department of Revenue for answers to <br /> I 48 questions in this area. The Contracting Agency will not adjust its payment if the <br /> 49 Contractor bases a bid on a misunderstood tax liability. <br /> 50 <br /> I <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 19 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.