My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Nil <br /> ' EVE R E T T CITY OF EVERETT, WASHINGTON <br /> III <br /> WASHINGTON PUBLIC WORKS DEPARTMENT <br /> ADDENDUM NO. 1 <br /> Maple Heights Bridge Seismic Retrofit <br /> I PW 3693 <br /> Federal Aid# BHM-2776(008) <br /> June 2, 2020 <br /> INotice to Planholders: <br /> I This Addendum No. 1 contains the following revisions, additions, <br /> deletions, and/or clarifications, is hereby made a part of the plans and <br /> specifications (Contract Documents) for the above-named project and <br /> Ishall be taken into consideration by Bidders in submitting their bids. <br /> Bidders shall acknowledge receipt of this Addendum No. 1 in the space <br /> provided on the Proposal. Failure to do so may subject the Bidder to <br /> Idisqualification of its bid. <br /> 1 SPECIAL PROVISIONS <br /> Remove and replace all pages <br /> 1 Division 1 <br /> • On page 5, the following shall be added to section 1-02.6 Preparation <br /> I of Proposal at line 37: <br /> 1-02.6.I NST2.G R1 <br /> The fourth paragraph of Section 1-02.6 is revised to read: <br /> I <br /> 1-02.6.OPT2.GR1 <br /> (June 3, 2019) <br /> IThe Bidder shall submit with the Bid a completed Underutilized <br /> Disadvantaged Business Enterprise (UDBE) Utilization Certification, <br /> 1 when required by the Special Provisions. For each and every UDBE <br /> firm listed on the Bidder's completed Underutilized Disadvantaged <br /> PUBLIC WORKS Business Enterprise Utilization Certification,the Bidder shall submit <br /> ig, written confirmation from that UDBE firm that the UDBE is in <br /> 3200 Cedar Street agreement with the UDBE participation commitment that the <br /> Everett,WA 98201 Bidder has made in the Bidder's completed Underutilized <br /> lb425.257.8800 Disadvantaged Business Enterprise Utilization Certification. WSDOT <br /> 425.257.8883ax Form 422 031U (Underutilized Disadvantaged Business Enterprise <br /> everettp@everettwa.gov Written Confirmation Document) is to be used for this purpose. <br /> everettwa.go' w Bidder must submit good faith effort documentation only in the <br /> event the bidder's efforts to solicit sufficient UDBE participation <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.