My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> have been unsuccessful. The Bidder shall submit a UDBE Bid Item Breakdown form I <br /> defining the scope of work to be performed by each UDBE listed on the UDBE <br /> Utilization Certification. If the Bidder lists a UDBE Trucking firm on the UDBE <br /> Utilization Certification, then the Bidder must also submit a UDBE Trucking Credit <br /> Form (WSDOT Form 272-058) documenting how the UDBE Trucking firm will be <br /> able to perform the scope of work subcontracted to them. Directions for delivery I <br /> of the Underutilized Disadvantaged Business Enterprise Written Confirmation <br /> Documents, Underutilized Disadvantaged Business Enterprise Good Faith Effort <br /> documentation, UDBE Bid Item Breakdown Form and the UDBE Trucking Credit <br /> Form are included in Section 1-02.9. <br /> The Bidder shall submit a UDBE Bid Item Breakdown form defining the scope of <br /> work to be performed by each UDBE listed on the UDBE Utilization Certification. <br /> If the Bidder lists a UDBE Trucking firm on the UDBE Utilization Certification, then <br /> the Bidder must also submit a UDBE Trucking Credit Form (WSDOT Form 272-058) <br /> documenting how the UDBE Trucking firm will be able to perform the scope of <br /> work subcontracted to them. Directions for delivery of the Underutilized <br /> Disadvantaged Business Enterprise Written Confirmation Documents, <br /> Underutilized Disadvantaged Business Enterprise Good Faith Effort <br /> documentation, UDBE Bid Item Breakdown Form and the UDBE Trucking Credit I <br /> Form are included in Section 1-02.9. <br /> • On page 19, the following shall be added to section 1-07.1 Confined Space beginning I <br /> at line 24: <br /> 1-07.1.OPT4.GR1 <br /> (April 6, 2020) <br /> In response to COVID-19, the Contractor shall prepare a project specific COVID-19 <br /> health and safety plan (CHSP) in conformance with Section 1-07.4(2) as <br /> 111 <br /> supplemented in these specifications, COVID-19 Health and Safety Plan (CHSP). A <br /> copy of the CHSP developed by the Contractor shall be submitted to the Engineer <br /> as a Type 2 Working Drawing. I <br /> • On page 25, the following shall be added to section 1-07.4(2) Health Hazards at line <br /> 34: 1 <br /> 1-07.4(2),INST2.GR1 <br /> Section 1-07.4(2) is supplemented with the following: <br /> 1-07.4(2).OPT2.GR1 <br /> (April 7, 2020) <br /> COVID-19 Health and Safety Plan (CHSP) <br /> The Contractor shall prepare a project specific COVID-19 health and safety plan <br /> (CHSP). The CHSP shall be prepared and submitted as a Type 2 Working Drawing I <br /> prior to beginning physical Work. <br /> Page 2 of 5 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.