My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Intents and Affidavits 1 <br /> 2 On forms provided by the Industrial Statistician of State L&I, the Contractor shall submit to <br /> 3 the Engineer the following for themselves and for each firm covered under RCW 39.12 I <br /> 4 that will or has provided Work and materials for the Contract: <br /> 5 <br /> 6 1. The approved "Statement of Intent to Pay Prevailing Wages" State L&I's form <br /> 7 number F700-029-000. The Contracting Agency will make no payment under this <br /> 8 Contract until this statement has been approved by State L&I and reviewed by <br /> 9 the Engineer. <br /> 10 I <br /> 11 2. The approved "Affidavit of Prevailing Wages Paid", State L&I's form number <br /> 12 F700-007-000. The Contracting Agency will not grant Completion until all <br /> 13 approved Affidavit of Wages paid for the Contractor and all Subcontractors have I <br /> 14 been received by the Engineer. The Contracting Agency will not release to the <br /> 15 Contractor any funds retained under RCW 60.28.011 until "Affidavit of Prevailing <br /> 16 Wages Paid" forms have been approved by State L&I and all of the approved I <br /> 17 forms have been submitted to the Engineer for every firm that worked on the <br /> 18 Contract. <br /> 19 I 20 The Contractor is responsible for requesting these forms from State L&I and for paying <br /> 21 any fees required by State L&I. <br /> 22 <br /> 23 Certified PayrollsIl <br /> 24 Certified payrolls are required to be submitted by the Contractor for themselves, all <br /> 25 Subcontractors and all lower tier subcontractors. The payrolls shall be submitted weekly <br /> 26 on all Federal-aid projects and no less than monthly on State funded projects. , <br /> 27 <br /> 28 Penalties for Noncompliance <br /> 29 The Contractor is advised, if these payrolls are not supplied within the prescribed II <br /> 30 deadlines, any or all payments may be withheld until compliance is achieved. In addition, <br /> 31 failure to provide these payrolls may result in other sanctions as provided by State laws <br /> 32 (RCW 39.12.050) and/or Federal regulations (29 CFR 5.12). <br /> 33 <br /> 34 1-07.11.G R 1 <br /> 35 Requirements for Nondiscrimination <br /> 36 <br /> 37 1-07.11.INST1.GR1 <br /> 38 Section 1-07.11 is supplemented with the following: <br /> 39 <br /> 40 1-07.11.OPT1.GR1 <br /> 41 (September 3, 2019) <br /> 42 Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive I <br /> 43 Order 11246) <br /> 44 <br /> 45 1. The Contractor's attention is called to the Equal Opportunity Clause and the Standard I <br /> 46 Federal Equal Employment Opportunity Construction Contract Specifications set <br /> 47 forth herein. <br /> 48 1 <br /> I <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 28 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.