My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The State rates incorporated in this contract are applicable to all construction <br /> 2 activities associated with this contract. <br /> I 3 <br /> 4 1-07.9(1).OPT4.GR1 <br /> 5 (April 2, 2007) <br /> I 6 Application of Wage Rates for the Occupation of Landscape Construction <br /> 7 State prevailing wage rates for public works contracts are included in this contract <br /> 8 and show a separate listing for the occupation: <br /> I 9 <br /> 10 Landscape Construction, which includes several different occupation <br /> 11 descriptions such as: Irrigation and Landscape Plumbers, Irrigation and <br /> 12 Landscape Power Equipment Operators, and Landscaping or Planting <br /> I13 Laborers. <br /> 14 <br /> 15 In addition, federal wage rates that are included in this contract may also include <br /> I 16 occupation descriptions in Federal Occupational groups for work also specifically <br /> 17 identified with landscaping such as: <br /> 18 <br /> 19 Laborers with the occupation description, Landscaping or Planting, or <br /> 20 <br /> 21 Power Equipment Operators with the occupation description, Mulch Seeding <br /> 22 Operator. <br /> 23 <br /> 24 If Federal wage rates include one or more rates specified as applicable to <br /> I 25 landscaping work, then Federal wage rates for all occupation descriptions, specific <br /> 26 or general, must be considered and compared with corresponding State wage rates. <br /> 27 The higher wage rate, either State or Federal, becomes the minimum wage rate for <br /> 28 the work performed in that occupation. <br /> I29 <br /> 30 Contractors are responsible for determining the appropriate crafts necessary to <br /> 31 perform the contract work. If a classification considered necessary for performance <br /> I 32 of the work is missing from the Federal Wage Determination applicable to the <br /> 33 contract, the Contractor shall initiate a request for approval of a proposed wage and <br /> 34 benefit rate. The Contractor shall prepare and submit Standard Form 1444, Request <br /> I 35 for Authorization of Additional Classification and Wage Rate available at <br /> 36 http://www.wdol.gov/docs/sf1444.pdf, and submit the completed form to the <br /> 37 Engineer's office. The presence of a classification wage on the Washington State <br /> I <br /> 38 Prevailing Wage Rates For Public Works Contracts does not exempt the use of form <br /> 39 1444 for the purpose of determining a federal classification wage rate. <br /> 40 <br /> I41 1-07.9(5).RTF <br /> 42 1-07.9(5) Required Documents <br /> 43 (January 3, 2020 APWA GSP) <br /> 44 <br /> II <br /> 45 Delete this section and replace it with the following: <br /> 46 <br /> 47 General <br /> 48 All "Statements of Intent to Pay Prevailing Wages", "Affidavits of Wages Paid" and Certified <br /> 49 Payrolls, including a signed Statement of Compliance for Federal-aid projects, shall be <br /> 50 submitted to the Engineer and the State L&I online Prevailing Wage Intent & Affidavit <br /> I 51 (PWIA) system. <br /> 52 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 27 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.