My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Crediting DBE Participation <br /> 2 Subcontractors proposed as COA must be certified prior to the due date for bids on <br /> 3 the Contract. All non-COA DBE Subcontractors shall be certified before the I <br /> 4 subcontract on which they are participating is executed. <br /> 5 <br /> 6 DBE participation is only credited upon payment to the DBE. <br /> 7 <br /> 8 The following are some definitions of what may be counted as DBE participation. <br /> 9 <br /> 10 DBE Prime Contractor <br /> 11 Only take credit for that portion of the total dollar value of the Contract equal to <br /> 12 the distinct, clearly defined portion of the Work that the DBE Prime Contractor <br /> 13 performs with its own forces and is certified to perform. <br /> 14 <br /> 15 DBE Subcontractor <br /> 16 Only take credit for that portion of the total dollar value of the subcontract that is I <br /> 17 equal to the distinct, clearly defined portion of the Work that the DBE performs <br /> 18 with its own forces and is certified to perform. The value of work performed by <br /> 19 the DBE includes the cost of supplies and materials purchased by the DBE and I <br /> 20 equipment leased by the DBE, for its work on the contract. Supplies, materials <br /> 21 or equipment obtained by a DBE that are not utilized or incorporated in the <br /> 22 contract work by the DBE will not be eligible for DBE credit. <br /> 23 <br /> 24 The supplies, materials, and equipment purchased or leased from the <br /> 25 Contractor or its affiliate, including any Contractor's resources available to DBE <br /> 26 subcontractors at no cost, shall not be credited. <br /> 27 <br /> 28 DBE credit will not be given in instances where the equipment lease includes <br /> 29 the operator. The DBE is expected to operate the equipment used in the I <br /> 30 performance of its work under the contract with its own forces. Situations where <br /> 31 equipment is leased and used by the DBE, but payment is deducted from the <br /> 32 Contractor's payment to the DBE is not allowed. <br /> 33 <br /> 34 When the subcontractor is part of a UDBE Commitment, the following apply: <br /> 35 <br /> 36 1. If a UDBE subcontracts a portion of the Work of its contract to another <br /> 37 firm, the value of the subcontracted Work may be counted toward the <br /> 38 UDBE COA Goal only if the Lower-Tier Subcontractor is also a UDBE. <br /> 39 <br /> 40 2. Work subcontracted to a Lower-Tier Subcontractor that is a DBE, but not <br /> 41 a UDBE, may be counted as DBE participation but not counted toward <br /> 42 the UDBE COA Goal. <br /> 43 <br /> 44 3. Work subcontracted to a non-DBE does not count towards the UDBE <br /> 45 COA Goal nor DBE participation. ' <br /> 46 <br /> 47 DBE Subcontract and Lower Tier Subcontract Documents <br /> 48 There must be a subcontract agreement that complies with 49 CFR Part 26 and I <br /> 49 fully describes the distinct elements of Work committed to be performed by the <br /> 50 DBE. <br /> 51 <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 38 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.