My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' • On page 94, the following shall be added at line 49 to section 7-01.3 Construction <br /> Requirements: <br /> Additional bridge scupper grates shall be procured by the Contractor. The <br /> additional bridge scupper grates are to be delivered to the following address and <br /> will become the property of the City of Everett: <br /> 4015 Railway Ave <br /> Everett, WA 98201 <br /> The Contractor shall coordinate with the Engineer before delivering the additional <br /> grates to the site. <br /> • On page 95,the following shall be added at line 22 to section 7-01.4 Measurement: <br /> Additional bridge scupper grates will be measured per each. <br /> • On page 95,the following shall be added at line 39 to section 7-01.5 Payment: <br /> "Additional Bridge Scupper Grates", per each. <br /> The unit contract price for"Additional Bridge Scupper Grates" shall be full pay for <br /> procurement of the grates and all labor,tools,and equipment necessary to deliver <br /> the materials to the specified stockpile location. <br /> • On page 96,the following shall be added at line 35 to section 7-04.5 Payment: <br /> The unit contract price per lineal foot for Solid Wall PVC Storm Sewer Pipe 8 In. <br /> Diam. shall be full pay for all Work to complete installation, including adjustment <br /> of inverts to manholes and furnishing and installing a tee and coupler connection <br /> to existing pipe. <br /> • On page 97, at line 6, section 7-05 and subsequent sections of 7-05 shall be added to <br /> address the installation of a Floatable Material Separator. <br /> PROPOSAL <br /> • Remove and replace pages 2 - 4 which are the Bid sheets. This change will address the <br /> errors that were in items that had Estimate, Force Account,and Calculated amounts.Also, <br /> an additional bid items was added — Additional Bridge Scupper Grates and Rock Slope <br /> Protection. <br /> • Remove and replace page 11 which is part of the UDBE form which has an errant 11% <br /> filled in the blank. UDBE goal will remain 11%. <br /> All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made a part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> Sincerel <br /> Gael L. Fisk, P.E. <br /> Project Engineer <br /> Attachments: Proposal (pages referenced above) <br /> INN <br /> Page 5 of 5 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.