Laserfiche WebLink
I <br /> ' • On page 94, the following shall be added at line 49 to section 7-01.3 Construction <br /> Requirements: <br /> Additional bridge scupper grates shall be procured by the Contractor. The <br /> additional bridge scupper grates are to be delivered to the following address and <br /> will become the property of the City of Everett: <br /> 4015 Railway Ave <br /> Everett, WA 98201 <br /> The Contractor shall coordinate with the Engineer before delivering the additional <br /> grates to the site. <br /> • On page 95,the following shall be added at line 22 to section 7-01.4 Measurement: <br /> Additional bridge scupper grates will be measured per each. <br /> • On page 95,the following shall be added at line 39 to section 7-01.5 Payment: <br /> "Additional Bridge Scupper Grates", per each. <br /> The unit contract price for"Additional Bridge Scupper Grates" shall be full pay for <br /> procurement of the grates and all labor,tools,and equipment necessary to deliver <br /> the materials to the specified stockpile location. <br /> • On page 96,the following shall be added at line 35 to section 7-04.5 Payment: <br /> The unit contract price per lineal foot for Solid Wall PVC Storm Sewer Pipe 8 In. <br /> Diam. shall be full pay for all Work to complete installation, including adjustment <br /> of inverts to manholes and furnishing and installing a tee and coupler connection <br /> to existing pipe. <br /> • On page 97, at line 6, section 7-05 and subsequent sections of 7-05 shall be added to <br /> address the installation of a Floatable Material Separator. <br /> PROPOSAL <br /> • Remove and replace pages 2 - 4 which are the Bid sheets. This change will address the <br /> errors that were in items that had Estimate, Force Account,and Calculated amounts.Also, <br /> an additional bid items was added — Additional Bridge Scupper Grates and Rock Slope <br /> Protection. <br /> • Remove and replace page 11 which is part of the UDBE form which has an errant 11% <br /> filled in the blank. UDBE goal will remain 11%. <br /> All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made a part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> Sincerel <br /> Gael L. Fisk, P.E. <br /> Project Engineer <br /> Attachments: Proposal (pages referenced above) <br /> INN <br /> Page 5 of 5 <br /> I <br />