My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 1-08.1.0ptionA.RTF <br /> 2 1-08.1 Subcontracting <br /> 3 (December 19, 2019 APWA GSP, Option A) <br /> 4 <br /> 5 Supplement this section with the following: <br /> 6 <br /> 7 Prior to any subcontractor or lower tier subcontractor beginning work, the Contractor shall <br /> 8 submit to the Engineer a certification (WSDOT Form 420-004) that a written agreement <br /> 9 between the Contractor and the subcontractor or between the subcontractor and any lower <br /> 10 tier subcontractor has been executed. This certification shall also guarantee that these <br /> 11 subcontract agreements include all the documents required by the Special Provision Federal <br /> 12 Agency Inspection. <br /> 13 <br /> 14 A Subcontractor or lower tier Subcontractor will not be permitted to perform any work under <br /> 15 the contract until the following documents have been completed and submitted to the <br /> 16 Engineer: <br /> 17 <br /> 18 1. Request to Sublet Work (WSDOT Form 421-012), and <br /> I 19 20 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for Federal-aid <br /> Projects (WSDOT Form 420-004). <br /> 21 <br /> I 22 The Contractor shall submit to the Engineer a completed Monthly Retainage Report <br /> 23 (WSDOT Form 272-065) within 15 calendar days after receipt of every monthly progress <br /> 24 payment until every Subcontractor and lower tier Subcontractor's retainage has been <br /> 25 released. <br /> 26 <br /> 27 The ninth paragraph, beginning with "On all projects, ... is revised to read: <br /> 28 <br /> 29 The Contractor shall certify to the actual amount received from the Contracting Agency <br /> 30 and amounts paid to all firms that were used as Subcontractors, lower tier <br /> 31 subcontractors, manufacturers, regular dealers, or service providers on the Contract. <br /> 32 This includes all Disadvantaged, Minority, Small, Veteran or Women's Business <br /> 33 Enterprise firms. This Certification shall be submitted to the Engineer on a monthly basis <br /> 34 each month between Execution of the Contract and Physical Completion of the Contract <br /> 35 using the application available at: https.//wsdot.diversitycompliance.com. A monthly <br /> 36 report shall be submitted for every month between Execution of the Contract and <br /> 37 Physical Completion regardless of whether payments were made or work occurred. <br /> 38 <br /> 39 1-08.3.GR1 <br /> 40 Progress Schedule <br /> 41 <br /> 42 1 08.3(2).GR1 <br /> 43 Progress Schedule Types <br /> 44 <br /> 45 1-08.3(2)A.RTF.DOCX <br /> 46 1-08.3(2)A Type A Progress Schedule <br /> 47 (March 13, 2012 APWA GSP) <br /> I 48 <br /> 49 Revise this section to read: <br /> 50 <br /> 51 The Contractor shall submit 4 copies of a Type A Progress Schedule no later than at the <br /> 52 preconstruction conference, or some other mutually agreed upon submittal time. The <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 63 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.