Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 Agency or the Contractor and that the recommendations concerning any such <br /> 2 dispute are advisory. <br /> I 3 <br /> 4 The Contracting Agency and the Contractor shall furnish to the Board <br /> 5 documents in accordance with the Three-Party Agreement. <br /> I 6 <br /> 7 Regular Disputes Review Board Meetings <br /> 8 All regular Board meetings will be held at or near the job site. The frequency of <br /> I 9 regular meetings will be set by mutual agreement of the Board, the Contracting <br /> 10 Agency and the Contractor. Each regular meeting is expected to consist of a <br /> 11 round table discussion and a field inspection of the project site.A member of the <br /> 12 Contracting Agency and Contractor are expected to jointly facilitate the round <br /> I13 table discussion. Round table discussion attendees are expected to include <br /> 14 selected personnel from the Contracting Agency and the Contractor. The <br /> 15 agenda for each meeting will be managed by the Board. <br /> II 16 <br /> 17 Standard Procedure for Consideration of Disputes <br /> 18 Dispute Referral <br /> I <br /> 19 Disputes shall be referred in writing to the Board chair with a copy <br /> 20 concurrently provided to the other Board members and the other party. <br /> 21 <br /> I 22 1. The dispute referral shall concisely define the nature and specifics <br /> 23 of the dispute that is proposed to be considered by the Board and <br /> 24 the scope of the recommendation requested. This referral is not <br /> I <br /> 25 26 expected to contain a mutually agreed upon statement of the <br /> dispute. <br /> 27 <br /> 28 2. The Board chair shall confer with the parties to establish a briefing <br /> I29 schedule for delivering prehearing submittals/rebuttals, and a <br /> 30 date, time, and location for convening the Board for a hearing. <br /> 31 <br /> I 32 Pre-Hearing Submittal <br /> 33 1. The Contracting Agency and the Contractor shall each prepare a pre- <br /> 34 hearing submittal and transmit both a hard copy and an electronic copy <br /> I 35 of it to all three members of the Board and the other party. The pre- <br /> 36 hearing submittal, comprising a position paper with such backup data <br /> 37 as is referenced in the position paper, shall be tabbed, indexed, and <br /> I 38 the pages consecutively numbered. <br /> 39 <br /> 40 2. Both position papers shall, at a minimum, contain the following: <br /> I 41 <br /> 42 a. A mutually agreed upon joint statement of the dispute and the <br /> 43 scope of the desired report being requested of the Board, placed <br /> 44 at the beginning of the papers. The language of this joint statement <br /> I 45 shall summarize in a few sentences the nature of the dispute. If <br /> 46 the parties are unable to agree on the wording of the joint <br /> 47 statement of dispute, each party's position paper shall contain both <br /> I 48 statements, and identify the party authoring each statement. <br /> 49 <br /> 50 b. The basis and justification for the party's position, with reference <br /> 51 to Contract language and other supporting documents for each <br /> 52 element of the dispute. In order to minimize duplication and <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 73 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.