My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 whether the hearing shall proceed as originally scheduled, or allow <br /> 2 additional time for the submittal and/or reschedule the hearing. On the final <br /> 3 date and time established for the hearing, the Board shall proceed with the I <br /> 4 hearing utilizing the information that has been submitted. <br /> 5 <br /> 6 In the event that representatives of either the Contracting Agency or the I <br /> 7 Contractor fail to appear at the appointed time of a hearing, the Board shall <br /> 8 postpone the hearing until such time as representatives from both parties <br /> 9 are available to proceed with the hearing. <br /> 10 <br /> 11 Use of Outside Experts <br /> 12 1. By the Contracting Agency or the Contractor: <br /> 13 <br /> 14 a. A party intending to offer an outside expert's analysis at the <br /> 15 hearing shall notify the other party and the Board in writing no less <br /> 16 than 30 calendar days prior to the due date for delivering the pre- I <br /> 17 hearing submittal, and provide the following disclosure: <br /> 18 <br /> 19 i. The expert's name and a general statement of the area of the I <br /> 20 dispute that will be covered by his or her testimony. <br /> 21 <br /> 22 ii. A statement prepared by the proposed expert which I <br /> 23 addresses the requirements of the Establishment of the <br /> 24 Board subsection of this Special Provision, item 2. <br /> 25 I 26 iii. A statement prepared by the proposed expert which identifies <br /> 27 the experience and training which qualifies them as an expert. <br /> 28 <br /> 29 b. Upon receipt of the disclosure, the other party shall have the I <br /> 30 opportunity to secure the services of an outside expert to address <br /> 31 or respond to those issues that may be raised by the other party's <br /> 32 outside expert. The notification and disclosure requirement shall <br /> 33 be the same as that specified elsewhere in this section, except the <br /> 34 time requirement is 21 calendar days. <br /> 35 <br /> 36 2. By the Board: <br /> 37 <br /> 38 a. When requested by the Board and subject to approval of the <br /> 39 parties, outside experts may be needed to assist the Board. In <br /> 40 such cases, the outside expert shall in no way be deemed <br /> 41 authorized to usurp the Board's authority to issue the Board <br /> 42 recommendations. Such authority shall remain vested solely in the <br /> 43 Board. <br /> 44 <br /> 45 b. Prior to arranging for outside experts, the Board shall obtain prior I <br /> 46 approval from the Contracting Agency and the Contractor by <br /> 47 providing: <br /> 48 <br /> 49 i. A statement explaining why the expert assistance is needed. <br /> 50 <br /> 51 ii. An estimate of the cost of the expert assistance. <br /> 52 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 76 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.