Laserfiche WebLink
1 1-10.4(1).GR1 <br /> 2 Lump Sum Bid for Project(No Unit Items) <br /> 3 <br /> 4 1-10.4(1),INST1.GR1 <br /> 5 Section 1-10.4(1) is supplemented with the following: <br /> 6 <br /> 7 1-10.4(1).OPT1.GR1 <br /> 8 (August 2, 2004) <br /> 9 The proposal contains the item "Project Temporary Traffic Control", lump sum. The <br /> 10 provisions of Section 1-10.4(1) shall apply. <br /> 11 <br /> 12 DIVISION2.GR2 <br /> 13 Division 2 <br /> 14 Earthwork <br /> 16 <br /> 16 2-01.GR2 <br /> 17 Clearing, Grubbing, and Roadside Cleanup <br /> 18 <br /> 19 2-01.1.G R2 <br /> 20 Description <br /> 21 <br /> 22 2-01.1.INST1.GR2 <br /> 23 Section 2-01.1 is supplemented with the following: <br /> 24 <br /> 25 2-01.1.OPT1.FR2.DOCX <br /> 26 (March 13, 1995) <br /> 27 Clearing and grubbing on this project shall be performed within the following limits: <br /> 28 <br /> 29 *** South of the west approach to the Maple Heights Bridge, as shown in the Plans. 111 <br /> 30 *** <br /> 31 <br /> 32 2-02.GR2 <br /> 33 Removal of Structures and Obstructions <br /> 35 <br /> 35 2-02.3.G R2 <br /> 36 Construction Requirements <br /> 37 <br /> 38 2-02.3.INST1.GR2 <br /> 39 Section 2-02.3 is supplemented with the following: <br /> 40 <br /> 41 2-02.3.OPT1.FR2.DOCX I <br /> 42 (February 17, 1998) <br /> 43 Removal of Obstructions <br /> 44 *** This work shall consist of removing and disposing of various existing improvements I <br /> 45 within the construction limits shown on the plans including, but not limited to: <br /> 46 <br /> Item Unit Quantity <br /> Invasive Vegetation, at Pier Square Foot 975 <br /> 2 and for pathway up to the <br /> East Abutment <br /> 47 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 80 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />