My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1-10.4(1).GR1 <br /> 2 Lump Sum Bid for Project(No Unit Items) <br /> 3 <br /> 4 1-10.4(1),INST1.GR1 <br /> 5 Section 1-10.4(1) is supplemented with the following: <br /> 6 <br /> 7 1-10.4(1).OPT1.GR1 <br /> 8 (August 2, 2004) <br /> 9 The proposal contains the item "Project Temporary Traffic Control", lump sum. The <br /> 10 provisions of Section 1-10.4(1) shall apply. <br /> 11 <br /> 12 DIVISION2.GR2 <br /> 13 Division 2 <br /> 14 Earthwork <br /> 16 <br /> 16 2-01.GR2 <br /> 17 Clearing, Grubbing, and Roadside Cleanup <br /> 18 <br /> 19 2-01.1.G R2 <br /> 20 Description <br /> 21 <br /> 22 2-01.1.INST1.GR2 <br /> 23 Section 2-01.1 is supplemented with the following: <br /> 24 <br /> 25 2-01.1.OPT1.FR2.DOCX <br /> 26 (March 13, 1995) <br /> 27 Clearing and grubbing on this project shall be performed within the following limits: <br /> 28 <br /> 29 *** South of the west approach to the Maple Heights Bridge, as shown in the Plans. 111 <br /> 30 *** <br /> 31 <br /> 32 2-02.GR2 <br /> 33 Removal of Structures and Obstructions <br /> 35 <br /> 35 2-02.3.G R2 <br /> 36 Construction Requirements <br /> 37 <br /> 38 2-02.3.INST1.GR2 <br /> 39 Section 2-02.3 is supplemented with the following: <br /> 40 <br /> 41 2-02.3.OPT1.FR2.DOCX I <br /> 42 (February 17, 1998) <br /> 43 Removal of Obstructions <br /> 44 *** This work shall consist of removing and disposing of various existing improvements I <br /> 45 within the construction limits shown on the plans including, but not limited to: <br /> 46 <br /> Item Unit Quantity <br /> Invasive Vegetation, at Pier Square Foot 975 <br /> 2 and for pathway up to the <br /> East Abutment <br /> 47 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 80 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.