My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 It is also anticipated that the removal of any existing concrete prior to the grading of the <br /> 2 slope for the installation of the rock slope protection will be required. *** <br /> I 3 <br /> 4 2-02.3(2).GB2 <br /> 5 Removal of Bridges, Box Culverts, and other Drainage Structures <br /> I 6 <br /> 7 2-02.3(2),INST1.GB2 <br /> 8 Section 2-02.3(2) is supplemented with the following: <br /> I 9 <br /> 10 2-02.3(2).OPT1.DOCX <br /> 11 (******) <br /> 1 12 Removal of Drainage Structures and Pipes <br /> 13 Where shown in the Plans, or at other locations as determined by the Engineer, the <br /> 14 Contractor shall remove catch basins and bridge drains regardless of the size or <br /> I15 type, and storm drain pipe. Each catch basin, bridge drain, or storm drain pipe shall <br /> 16 be removed in its entirety. Prior to backfilling the resultant void, the Contractor shall <br /> 17 plug and abandon the existing catch basin pipe(s) with commercial concrete in <br /> 111 18 accordance with Section 7-08.3(4). <br /> 19 <br /> 20 Voids left by catch basin or storm drain pipe removal shall be backfilled and <br /> I 21 compacted in accordance with Section 2-03.3(14)C. <br /> 22 <br /> 23 All materials removed shall become the property of the Contractor and shall be <br /> I 24 disposed of outside the project limits. <br /> 25 <br /> 26 2-02.4.GR2 <br /> I 27 Measurement <br /> 28 <br /> 29 2-02.4.INST1.GR2 <br /> I 30 Section 2-02.4 is supplemented with the following: <br /> 31 <br /> 32 2-02.4.OPT1.DOCX <br /> I33 (******) <br /> 34 Removal of existing drainage pipe will be measured by the linear foot along the line and <br /> 35 slope of the drainage pipe prior to removal. <br /> 1 36 <br /> 37 Removal of drainage Structures will be measured per each for each drainage Structure <br /> 38 removed. <br /> I 39 <br /> 40 2-02.5.GR2 <br /> 41 Payment <br /> 1 42 <br /> 43 2-02.5.INST2.GR2 <br /> 44 Section 2-02.5 is supplemented with the following: <br /> I 45 <br /> 46 2-02.5.OPT1.DOCX <br /> 47 (******) <br /> I48 "Removing Existing Drainage Pipe", per linear foot. <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 81 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> i <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.