Laserfiche WebLink
I1 It is also anticipated that the removal of any existing concrete prior to the grading of the <br /> 2 slope for the installation of the rock slope protection will be required. *** <br /> I 3 <br /> 4 2-02.3(2).GB2 <br /> 5 Removal of Bridges, Box Culverts, and other Drainage Structures <br /> I 6 <br /> 7 2-02.3(2),INST1.GB2 <br /> 8 Section 2-02.3(2) is supplemented with the following: <br /> I 9 <br /> 10 2-02.3(2).OPT1.DOCX <br /> 11 (******) <br /> 1 12 Removal of Drainage Structures and Pipes <br /> 13 Where shown in the Plans, or at other locations as determined by the Engineer, the <br /> 14 Contractor shall remove catch basins and bridge drains regardless of the size or <br /> I15 type, and storm drain pipe. Each catch basin, bridge drain, or storm drain pipe shall <br /> 16 be removed in its entirety. Prior to backfilling the resultant void, the Contractor shall <br /> 17 plug and abandon the existing catch basin pipe(s) with commercial concrete in <br /> 111 18 accordance with Section 7-08.3(4). <br /> 19 <br /> 20 Voids left by catch basin or storm drain pipe removal shall be backfilled and <br /> I 21 compacted in accordance with Section 2-03.3(14)C. <br /> 22 <br /> 23 All materials removed shall become the property of the Contractor and shall be <br /> I 24 disposed of outside the project limits. <br /> 25 <br /> 26 2-02.4.GR2 <br /> I 27 Measurement <br /> 28 <br /> 29 2-02.4.INST1.GR2 <br /> I 30 Section 2-02.4 is supplemented with the following: <br /> 31 <br /> 32 2-02.4.OPT1.DOCX <br /> I33 (******) <br /> 34 Removal of existing drainage pipe will be measured by the linear foot along the line and <br /> 35 slope of the drainage pipe prior to removal. <br /> 1 36 <br /> 37 Removal of drainage Structures will be measured per each for each drainage Structure <br /> 38 removed. <br /> I 39 <br /> 40 2-02.5.GR2 <br /> 41 Payment <br /> 1 42 <br /> 43 2-02.5.INST2.GR2 <br /> 44 Section 2-02.5 is supplemented with the following: <br /> I 45 <br /> 46 2-02.5.OPT1.DOCX <br /> 47 (******) <br /> I48 "Removing Existing Drainage Pipe", per linear foot. <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 81 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> i <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />