Laserfiche WebLink
1 I 2 I 3 I 4 I 5 I 6 <br /> I <br /> MITSUBISHI CITY MULTI VRF OUTDOOR UNIT SCHEDULE <br /> Cooling Nom System Refrig Pipe Dim Preliminary Electrical-Per Module <br /> Efficiency Connected Design Cooling Design Heating Max Pipe Length High/Low Corrected Corrected Inverter Driven Added Field 208/230 or[460V] <br /> Nominal Cooling Nominal Heating IEER/EER Heating COP @ Capacity (% of Outdoor Temp Outdoor Temp from BC or 1st Pressure (inch) Cooling Total Heating Capacity Sound Pressure Compressor Charge (See MCA 208/230 or Mt System Tag Tag Reference M-Net Address Model Number Modules Capacity (BTU/h) Capacity(BTU/h) [SEER] 47°F[HSPF] _ NOM) DB (°F) WB (°F) Joint (feet) (See Note 4) Capacity (BTU/h) (BTU/h) (dBA) Type/Quantity Note 5) Voltage/Phase [460V] RFS MOCP Notes/Options DYKE A <br /> PURY- 208/230V /3- <br /> VRF-1 CU-4 51 P144TLMU-A P144 144,000.0 160,000.0 24.3/ 14 3.72 102.8% 86.0 19.3 119.8 7/8/ 1 1/8 138,267.8 106,382.9 61 SCROLUI 59.3 phase 3-wire 52/48 - 80/70 1, 2, 3, 4, 5 <br /> PURY- 208/230V /3- ARGHITEC-TUBE 0 DESIGN <br /> VRF-2 CU-5 60, 61 P216TSLMU-A P120, P96 216,000.0 243,000.0 22.9/ 12.4 3.59 92.6% 86.0 19.3 109.8 1 1/8/ 1 1/8 188,084.0 161,225.0 62 SCROLU2 74.0 phase 3-wire 42/39, 33/30 - 60/60, 50/50 1, 2, 3, 4, 5 <br /> Options: ww`.ykera .net 1716,Wees Marine View Drive <br /> Notes & O 5.25 <br /> P 429.3761 (T) 2nd Floor/Everett,WA- 98201 <br /> 1 Nominal cooling capacities are based on indoor coil EAT of 80/67°F (DB/WB), outdoor of 95°F (DB) <br /> 2 Nominal heating capacities are based on indoor coil EAT of 70°F (DB), outdoor of 43°F (WB) <br /> E 3 Efficiency values for EER, JEER, COP are based on AHRI 1230 test method for mixture of ducted & non-ducted indoor units. E <br /> 4 For systems with multiple modules, refrigerant pipe dimensions indicate total system combined piping downstream of module CONSULTANT: <br /> 5 Added field charge listed is in addition to factory charge, this must be updated based upon final as-built piping layout. <br /> MITSUBISHI CITY MULTI VRF INDOOR UNIT SCHEDULE PERMIT SET <br /> Estimated Our difference <br /> Cooling Coil LATI is engineered. <br /> Cooling Design Heating Design Corrected Capacity (°F)/[LWT] Max Fan ESP Sound Pressure <br /> : ;:j el , - <br /> Entering Temp Entering Temp Cooling Diversity Heating Diversity Estimated Refrig Pipe Dim Peak Fan Airflow Setting Per Fan Speed www.harrisgroup.com <br /> Nominal Cooling Nominal Heating DB/WB (°F)/ DB/WB (°F)/ Full/Partial (See Cooling Total Cooling Sensible Full/Partial (See Heating Capacity Heating Coil LAT Liquid/Suction (cfm)/[Design 208V/230V (IN 208V/230V Power Cooling Power Heating Electrical <br /> System Tag Room Name Tag Reference M-Net Address Model Type Capacity(BTU/h) Capacity (BTU/h) [Water in temp] [Water in temp] Note 5, 6) Capacity (BTU/h) Capacity (BTU/h) Note 5, 6) (BTU/h) (°F)/[LWT] (inch) gpm G(US)/min] WG) (dBA) Voltage/ Phase 208V/230V (kW) 208V/230V (kW) MCA/MFS Notes/ Optionsarrt f04 PROJECT Na 0070298.00 <br /> Ceiling cassette <br /> PLFY-P08NCMU-(4-way airflow) <br /> 208/230V/1- <br /> VRF-1 Quiet Room FC-1 1 ER4 type 8,000.0 9,000.0 75.0/62.5 72.0 FULL DEMAND 7,473.9 6,509.3 FULL DEMAND 5,767.7 57.6 87.3 1/4/1/2 350 29-32-38 phase 0.05 0.05 0.29/15 1, 2, 3, 4, 5, 6 — <br /> Ceiling cassette <br /> PLFY-P08NCMU-(4-way airflow) 2081230V/1- <br /> VRF-1 Branch Manager FC-2 2 ER4 type 8,000.0 9,000.0 75.0/62.5 72.0 FULL DEMAND 7,473.9 6,509.3 FULL DEMAND 5,767.7 57.6 87.3 1/4/ 1/2 350 29-32-38 phase 0.05 0.05 0.29/15 1, 2, 3, 4, 5, 6 ' <br /> REGISTRATION STAMP: <br /> Office, Break, <br /> Condor, Ceiling <br /> Storage, Secure PEFY-P24NMAU•concealed type 208/230V/1- 2.73(208V)/2.73( <br /> VRF-1 Storage ,FC-3 3 E3 (ducted) 24,000.0 27,000.0 75.0/62.5 72.0 FULL DEMAND 22,421.8 19,103.4 FULL DEMAND 17,303.2 54.8 90.2 3/8/5/8 883 0.6/0.6 30-34-39 phase 0.17 0.15 230V)/15 1, 2, 3, 4, 5, 6 tilalli) 4 <br /> 'Ceiling cassette . <br /> PLFY-P08NCMU-(4-way airflow) 208/230V/1- WARIIN • <br /> .� ri <br /> VRF-1 Laptop Bar FC-4 4 ER4 type 8,000.0 9,000.0 75.0/62.5 72.0 FULL DEMAND 7,473.9 6,509.3 FULL DEMAND 5,767.7 57.6 87.3 1/4/ 1/2 350 29-32-38 phase 0.05 0.05 0.29/15 1, 2, 3, 4, 5, 6 ' � <br /> Ceiling cassette 208/230V/1- ' rs <br /> 9430 i <br /> PLFY-P08NCMU-(4-way airflow) <br /> VRF-1 Group Study B FC-5 5 ER4 type 8,000.0 9,000.0 75.0/62.5 72.0 FULL DEMAND 7,473.9 6,509.3 FULL DEMAND 5,767.7 57.6 87.3 1/4/ 1/2 350 29-32-38 phase 0.05 0.05 0.29/15 1, 2, 3, 4, 5, 6 „i•r.<,L <br /> Ceiling cassette <br /> PLFY-P08NCMU-(4-way airflow) 208/230V/1- _ -ID <br /> _ <br /> D VRF-1 Group Study A FC-6 6 ER4 type 8,000.0 9,000.0 75.0/62.5 72.0 FULL DEMAND 7,473.9 6,509.3 FULL DEMAND 5,767.7 57.6 87.3 1/4/ 1/2 350 29-32-38 phase 0.05 0.05 0.29/15 1, 2, 3, 4, 5, 6 NI.Rb ECT IDENTIFICATION: D <br /> Ceiling <br /> Adult Stacks, PEFY-P36NMAU•concealed type <br /> 208/230V/1- 3.50(208V)/3.50( <br /> VRF-1 Living Room FC-7 7 E3 (ducted) 36,000.0 40,000.0 75.0/62.5 72.0 FULL DEMAND 33,632.7 27,831.8 FULL DEMAND 25,634.4 52.6 92.5 3/8/5/8 1165 0.6/0.6 32-37-41 phase 0.24 0.22 230V)/15 1, 2, 3, 4, 5, 6 <br /> Ceiling cassette Evergreen Branch <br /> Evergreen Room PLFY- (4-way airflow) 208/230V/1- <br /> VRF-1 B FC-8 8 EP24NEMU-E type 24,000.0 27,000.0 75.0/62.5 72.0 FULL DEMAND 22,421.8 16,830.8 FULL DEMAND 17,303.2 55.6 91.8 3/8/5/8 812 28-30-32-34 phase 0.04 0.03 0.54/0.54/15 1, 2, 3, 4, 5, 6 Library Expansion <br /> Ceiling cassette <br /> Evergreen Room PLFY- (4-way airflow) <br /> 208/230V/1- <br /> VRF-1 A FC-9 9 EP24NEMU-E type 24,000.0 27,000.0 75.0/62.5 72.0 FULL DEMAND 22,421.8 16,830.8 FULL DEMAND 17,303.2 55.6 91.8 3/8/5/8 812 28-30-32-34 phase 0.04 0.03 0.54/0.54/15 1, 2, 3, 4, 5, 6 FOR <br /> Teen Stacks, <br /> Public Ceiling <br /> Computing & PEFY-P48NMAU•concealed type 208/230V/1 3.51(208V)/3.51( City of Everett <br /> VRF-2 Copier FC-10 10 E3 (ducted) 48,000.0 54,000.0 75.0/62.5 72.0 FULL DEMAND 45,140.2 35,628.1 FULL DEMAND 38,694.0 51.4 97.5 3/8/5/8 1412 0.6/0.6 35-40-44 phase 0.34 0.32 230V)/15 1, 2, 3, 4, 5, 6 _ <br /> Ceiling <br /> PEFY-P24NMAU•concealed type 208/230V/1- 2.73(208V)/2.73( <br /> — VRF-2 Adult Seating FC-11 11 E3 (ducted) 24,000.0 27,000.0 75.0/62.5 72.0 FULL DEMAND 22,570.1 19,166.1 FULL DEMAND 19,347.0 54.7 92.4 3/8/5/8 883 0.6/0.6 30-34-39 phase 0.17 0.15 230V)115 1, 2, 3, 4, 5, 6 AT — <br /> Ceiling <br /> Children's PEFY-P3ONMAU•concealed type 208/230V/1- 2.73(208V)/2.73( <br /> VRF-2 Stacks FC-12 12 ,E3 (ducted) 30,000.0 34,000.0 75.0/62.5 72.0 FULL DEMAND 28,212.6 21,615.6 FULL DEMAND 24,362.9 52.1 97.7 3/8/5/8 883 0.6/0.6 30-34-39 phase 0.17 0.15 230V)/15 1, 2, 3, 4, 5, 6 9512 Evergreen Way <br /> Ceiling PEFY-P24NMAU•concealed type 208/230V/1 2.73(208V)/2.73( Everett WA 98204 <br /> VRF-2 Seating Area FC-13 13 E3 (ducted) 24,000.0 27,000.0 75.0/62.5 72.0 FULL DEMAND 22,570.1 19,166.1 FULL DEMAND 19,347.0 54.7 92.4 3/8/5/8 883 0.6/0.6 30-34-39 phase 0.17 0.15 230V)/15 1, 2, 3, 4, 5, 6 <br /> Circulation, Ceiling <br /> Sorting Area, PEFY-P18NMAU•concealed type <br /> 208/230V/1- 1.56(208V)/1.56( <br /> VRF-2 Workroom FC-14 14 E3 (ducted) 18,000.0 20,000.0 75.0/62.5 72.0 FULL DEMAND 16,927.6 13,726.9 FULL DEMAND 14,331.1 53.6 94.2 1/4/ 1/2 600 0.6/0.6 28-32-35 phase 0.11 0.09 230V)/15 1, 2, 3, 4, 5, 6 <br /> Ceiling cassette <br /> Circulation PLFY-P08NCMU-(4-way airflow) 208/230V/1- <br /> VRF-2 Manager FC-15 15 ER4 type 8,000.0 9,000.0 75.0/62.5 72.0 FULL DEMAND 7,523.4 6,530.0 FULL DEMAND 6,449.0 57.5 89.1 1/4/ 1/2 350 29-32-38 phase 0.05 0.05 0.29/15 1, 2, 3, 4, 5, 6 BID SET <br /> (FUTURE: <br /> Childrens This drawing is: <br /> C Activity, Corridor, Ceiling <br /> 1. Copyright 2017 Dykeman, Inc. C <br /> Entry Lobby, PEFY-P48NMAU•concealed type 208/230V/1- 3.51(208V)/3.51( 2. The Architects Instrument of Professional Service. <br /> VRF-2 Restrooms) FC-16 16 E3 (ducted) 48,000.0 54,000.0 75.0/62.5 72.0 FULL DEMAND 45,140.2 35,628.1 FULL DEMAND 38,694.0 51.4 97.5 3/8/5/8 1412 0.6/0.6 35-40-44 phase 0.34 0.32 230V)/15 1, 2, 3, 4, 5, 6 3. For use on this project only. Obtain Architects <br /> written permission for any other use or reproduction. <br /> PROJEjNUMBER: <br /> Notes & Options: . <br /> 1 Nominal cooling capacities are based on indoor coil EAT of 80/67°F (DB/WB), outdoor of 95°F (DB) <br /> 2 Nominal heating capacities are based on indoor coil EAT of 70°F (DB), outdoor of 43°F (WB) 2017-008 <br /> 3 See outdoor unit schedule for outdoor ambient conditions, connected capacity, and other factors associated with corrected <br /> 4 See schematic piping/control diagram for indication of required indoor unit remote controllers, system controllers, and <br /> Full demand corrected capacity includes de-rate associated with indoor vs. outdoor connected capacity indicated on outdoor R EVISIONS: <br /> unit schedule for associated system. Partial corrected capacity assumes sufficient diversity exists such that the connected <br /> capacity de-rate does not apply. It is the designer's responsibility to ensure"Diamond System Builder"is set in the MARK DATE DESCRIPTION <br /> 5 appropriate output capacity setting (full demand/partial demand) prior to generating this schedule. 08-17-17 DD COST EST. <br /> 6 It is recommended to always base heating corrected capacity on full demand. 08-17-17 DD SUBMITTAL <br /> 08-14-18 PERMIT SUBMITTAL _ <br /> 09-10-18 BID SET <br /> INPUT/OUTPUT DEVICE SCHEDULE <br /> Point Descriptions <br /> Device Type M-Net Address Model Number Al Channel 1 Al Channel 2 Al Channel 3 Al Channel 4 PI Channel 1 PI Channel 2 DIDO Channel 1 DIDO Channel 2 DIDO Channel 3 DIDO Channel 4 Power Supply Notes/ Options <br /> PAC-YG66DCA- 24VDC, 5W, <br /> DIDO Controller 20 J N/A N/A N/A N/A N/A N/A ERV-4 0.2A 1 <br /> Notes & Options: <br /> 1 See schematic piping/control diagram for indication of connection points and associated M-Net bus. <br /> B B <br /> LOSSNAY ENERGY RECOVERY VENTILATOR SCHEDULE PROJECTjTEAM: <br /> Nominal Recovery Effectiveness (Extra High Fan <br /> PRINCIPAL IN CHARGE: I RH <br /> Speed) <br /> Interlocked or Max ESP Temperature PROJECT MANAGER: I RH <br /> Lossnay Tag Model Number Stand Alone Core Type Airflow (cfm) (INWG) Recovery Enthalpy Cooling Enthalpy Heating Voltage/ Phase MCA/ MOCP Notes /Options PROJECT ENGINEER: I KLY <br /> DRAWN BY: I XXX <br /> LGH-F470RX5- Fixed Permeable 208-230V/1- <br /> ERV-1 El Stand-Alone Cross Plate 470 0.96 69.0% 51.0% 64.0% phase 3.1/15 1, 2, 3 KEYPLAN: <br /> LGH-F600RX5- Fixed Permeable 208-230V/1- <br /> ERV-2 El Stand-Alone Cross Plate 600 0.80 67.0% 50.0% 64.0% phase 3.6/15 1, 2, 3 <br /> LGH-F300RX5- Fixed Permeable 208-230V/1- <br /> ERV-3 El Stand-Alone Cross Plate 300 0.78 65.5% 50.0% 63.0% phase 1.7/15 1, 2, 3 <br /> Notes & Options: <br /> 1 Max external static pressure is at airflow listed with fan set on extra high speed. <br /> See schematic piping/control diagram for indication of required lossnay local remote controller(stand alone operation)and M • <br /> 2 Net connection points of associated systems. <br /> 3 Washable factory standard pre-filter on return and 0/A intake side of cross plate core. <br /> DRAWINGTITLE: <br /> VRF HEAT RECOVERY BRANCH CIRCUIT CONTROLLER <br /> A Type (double/ Connected A <br /> System Tag Tag Reference M-Net Address Model Number Main/Sub) Number of Ports Capacity to BC Voltage/Phase MCA 208/230 Notes / Options SCHEDULES <br /> CMB-P 1010NU- 208/230V/1- <br /> VRF-1 BC-1 52 HAI Main 10 148,000.0 phase 1.60/1.70 1, 2 <br /> CMB-P1010NU- 208/230V/1- <br /> VRF-2 BC-2 62 HAI Main 10 200,000.0 phase 1.60/1.70 1, 2 <br /> DRAWIN—G-NUMBEIME <br /> : <br /> Notes & Options: <br /> 1 Include Diamondback Ball Valves BV-Series, 700PSIG working pressure, full port, 410A rated. <br /> 2 Connected Capacity to BC should not exceed 189,000 BTU/h for double BCs and 126,000 BTU/h for Sub BCs. <br /> M 02 <br /> I I 2 I 3 I 4 I 5 I 6 <br /> 1--..:.1-.1 a- 11..:1.1--- ---- -- -- --- fl _- fl _ ------ n--.4a4..-.. w-.-.--_--a --- ...... L....- ........ %1......- •r-_,at.. n..-1 <br />