<br /> DUCTWORK SCHEDULE PLUMBING PIPING SCHEDULE
<br /> NOTE: ALL SYSTEMS AND PIPING MATERIALS MAY NOT BE USED ON EVERY PROJECTTb
<br /> WORKING PRESSURE SMACNA PRESSURE SMACNA SEAL SERVICE LOCATION SIZE PIPE PIPE MATERIAL FITTINGS JOINTS WORKING TEST NOTES
<br /> SERVICE/ USAGE LOCATION MATERIAL (IN. W.C.) CLASS (IN. W.C.) CLASS REMARKS STANDARD PRESSURE PRESSURE
<br /> SUPPLY AIR FROM DOAS TO DOMESTIC COLD WATER, DOMESTIC ABOVE GRADE 1/2" -3" COPPER TYPE L HARD DRAWN ASTM B88 WROUGHT COPPER WATER SAFE 70 PSIG 100 PSIG DY K E M A N
<br /> DISTRIBUTED FAN COILS SOLDER BCUP
<br /> LOW PRESSURE SUPPLY AIR GALV. STEEL LOW PRESSURE 1 B 1, 2 HOT WATER, DOMESTIC HOT WATER
<br /> SUPPLY AIR FROM FAN COILS & RTUs CIRCULATION BELOW GRADE 1/2"-4" COPPER TYPE K HARD DRAWN ASTM B88 WROUGHT COPPER WATER SAFE 70 PSIG 100 PSIG ARC H ITEGTU R E 0 DESIGN
<br /> TO GRDs SOLDER BCUP
<br /> FLEXIBLE DUCT CONNECTIONS TO GRDs PREINSUL. FLEX LOW PRESSURE RATED+6", -1" NA 3 STANDARD DUTY *
<br /> RETURN AIR FROM GRDs TO FAN COILS AND RTUs GALV. STEEL LOW PRESSURE 1 B t 2 SANITARY WASTE ABOVE GRADE 1-1/4" -6" NO-HUB CAST IRON SISPS 301 NO-HUB CAST IRON NO-HUB AMBIENT 5 PSIG COUPLINGS
<br /> °
<br /> TRANSFER AIR FROM GRD TO GRD GALV. STEEL LOW PRESSURE 1 B 1, 2 www..y a an.net 1716 West Marine View Drive
<br /> }
<br /> 4 5.25973161 Cr) 2nZc Floor Everett,WA 98201
<br /> GENERAL EXHAUST FROM GRD TO FAN AND AMBIENT GALV. STEEL LOW PRESSURE 1 B 1, 2 SANITARY VENT ABOVE GRADE 1-1/4" -4" PVC-SCHEDULE 40 SOLID CORE ASTM D2665 PVC SCHEDULE 40(SOLID CORE) SOLVENT WELD AMBIENT 5 PSIG
<br /> - .
<br /> E E
<br /> NOTES: 1. SHEET METAL GAGES AND FITTINGS PER SMACNA AND ALLIANT DUCT CONSTRUCTION STANDARDSCONSULTANT:
<br /> 2. INSTALL PER MFG. GUILDELINES AND INSTRUCTIONS
<br /> 3. FLEX DUCT TO HAVE MAXIMUM 8 FT. LENGTH. THERMAFLEX"GKM" OR EQUAL
<br /> PLUMBING VALVE SCHEDULE PERMIT SET
<br /> SERVICE SIZE PIPE FUNCTION TYPE CLASS MFG MODEL NO.
<br /> BALL VALVE: 2-PIECEOur difference
<br /> DUCTWORK I N S U LAT I o N 1/2" -3" COPPER SHUT-OFF FULL-PORT, BRONZE 600 APOLLO 77CLF-200 is engineered.
<br /> www.harris rou .com
<br /> NOTE: ALL SYSTEMS AND INSULATION TYPES MAY NOT BE USED ON EACH PROJECT CONSTRUCTION 9 P
<br /> DOMESTIC COLD WATER DOMESTIC 'r :„..,:,:r.::
<br /> . _,_
<br /> SERVICE DUCT LOCATION!TYPE FIBERGLASS INSULATION TYPE THICKNESS NOTES 1/2" -3" COPPER CHECK SWING CHECK VALVE 200 APOLLO 161S-LF PROJECT NO: 0070298.00
<br /> HOT WATER, DOMESTIC HOT WATER
<br /> OUTSIDE BUILDING ENVELOPE CIRCULATION
<br /> DOAS SUPPLY/ RETURN OUTSIDE GALVANIZED SHEETMETAL DUCT W/ INTERNAL INSUL TO HAVE MIN. R-8 BALL VALVE: 2-PIECE
<br /> - -
<br /> BUILDING OUTSIDE BUILDING ENVELOPE INTERNAL INSULATION 2" THERMAL PERFORMANCE 1/2" -3" COPPER THROTTLE FULL-PORT, BRONZE 600 APOLLO 7OLF-200
<br /> CONCEALED SUPPLY AIR OUTSIDE BUILDING ENVELOPE DUCT WRAP WITH VAPOR BARRIER 2" INTERNAL INSUL TO HAVE MIN. R-8 CONSTRUCTION _ __
<br /> THERMAL PERFORMANCE ACCEPTABLE ALTERNATE MANUFACTURERS: HAMMOND, MILWAUKEE REGISTRATION STAMP:
<br /> INSIDE BUILDING ENVELOPE
<br /> DOAS SUPPLY AIR DISTRIBUTION RISER IN VERTICAL SHAFT& HORIZONTAL NIA NIA DORS UNIT PROVIDES SUPPLY AIR �4:
<br /> 4;,c11A8.41/1‘
<br /> DISTRIBUTION WITHIN 15 °F OF SPACE TEMPERATURE
<br /> PLUMBING INSULATION SCHEDULE v . .3
<br /> a.
<br /> DOAS UNIT RETURN/ EXHAUST RISER IN VERTICAL SHAFT& HORIZONTAL N/A N/A INSULATION THICKNESS TABLE: , .4
<br /> :; ,.. 4419;2:00 i
<br /> DISTRIBUTION SYSTEM FLUID OPER. NSULATION TYPE INSULATION CONDUCTIVITY MEAN TEMPERATURE RUNOUTS UP TO 2" LESS 1"AND LESS 1-1/4" -2" 2-1/2"-4"
<br /> TEMP (F) (BTU/IN)/(HR*FT2*F) (F) THAN 12 FT
<br /> CELING PLENUM INSTALLATION: LOW
<br /> CONCEALED SUPPLY AIR PRESSURE SUPPLY FROM FAN COIL TO DUCT WRAP WITH MYLAR VAPOR BARRIER 1" DOMESTIC COLD WATER 45.75 FIBERGLASS 0.24-0.28 55 1/2" 1/2" 112" 1!2"
<br /> GRDs W/ASJ PROJECT IDENTIFICATIOND : D
<br /> EXPOSED SUPPLY AIR EXPOSED INSTALLATION: LOW PRESSURE N/A N/A FAN COIL PROVIDES SUPPLY AIR WITHIN FIBERGLASS
<br /> SUPPLY FROM FAN COIL TO GRDs 15 °F OF SPACE TEMPERATURE DOMESTIC HW AND HWR 105- 130 WIASJ 0.24-0.28 115 1/2" 1" 1" 1-1/2"
<br /> Evergreen Branch
<br /> RETURN AIR FROM GRD TO AHU N/A N/A DUCT IN CONDITIONED SPACE OR .h
<br /> CEILING Library Expansion
<br /> TRANSFER AIR CEILING PLENUM INSTALLATIION DUCT WRAP WITH MYLAR VAPOR BARRIER 1"
<br /> INSULATION SPECIFICATION: KNAUF, CERTAINTEED, OWENSCHORNING, OR APPROVED EQUAL PLUMBING PIPE HANGER SCHEDULE FOR
<br /> HORIZONTAL SPACING: PIPE SIZE 1/2" -3/4" 1" - 1-1/2" 2" 2-1/2"-3" 4"
<br /> NOTES: 1. FIBERGLASS ACOUSTIC DUCT LINER- 1.5 PCF 1"THICKNESS, R=4.0, GLASS FIBERS SHALL HAVE AIRSTREAM COATING TO PREVENT EROSION
<br /> 2. FIBERGLASS DUCT WRAP INSULATION-0.6 PCF- 1-1/2" THICKNESS, R=5.6-8.3, EXTERIOR FOIL SCRIM REINFORCED VAPOR BARRIER COVERING COPPER 6 FT 6 FT 10 FT 10 FT 10 FT City of Everett
<br /> PEX-A W/PIPE 6 FT 8 FT 8 FT NA NA
<br /> 3. FIBERGLASS RIGID BOARD INSULATION-2" THICKNESS,R=8.0-9.0, EXTERIOR FOIL SCRIM REINFORCED VAPOR BARRIER COVERING SUPPORT
<br /> 4. FIBERGLASS DUCT BOARD- 1" THICKNESS, R=4.0, EXTERIOR FOIL SCRIM REINFORCED VAPOR BARRIER COVERING, AIRSTREAM FIBERGLASS COATING PVC/ABS - 4 FT 4 FT 4 FT 4 FT
<br /> - 5. ALL INSULATION SHALL BE INSTALLED PER SMACNA GUILDELINES, AND MFG. INSTALLATION INSTRUCTIONS -
<br /> 6. DUCTWORK INSULATION SHALL BE INSTALLED AS INDICATED ON DRAWINGS AND AS REQUIRED PER CODE {SCHED 40) AT
<br /> NO HUB CAST IRON PIPE: 10 FT MAX SPACING. MIN (2)AHNGERS PER PIPE SECTION WITHIN 18" OF JOINT
<br /> MIN (2)HANGERS AT EACH CHANGE OF DIRECTION AND BRANCH FITTING. 951 2 Evergreen Way
<br /> SCHEDULE
<br /> FOR PEX-A WITH PIPE SUPPORT, REFER TO DETAIL FOR PIPE SUPPORT REQUIREMENTS Everett WA 98204
<br /> MECHANICAL PIPING HANGER SCHEDULE PIPE MATERIAL PIPE SIZE GALV. ROD MFG. FIG. INSUL SHIELD
<br /> NOTE: ALL SYSTEMS AND INSULATION TYPES MAY NOT BE USED ON EACH PROJECT COPPER 1/2" -2" 3/8" ANVIL CT-69 167
<br /> SERVICE LOCATION SIZE PIPE PIPE MAIL FITTINGS JOINTS WORKING TEST COPPER 2-1/2" -4" 318" ANVIL CT-260 167
<br /> STANDARD PRESSURE PRESSURE PEX-A W/PIPE 1/2" -2" 3/8" ANVIL 69 NA
<br /> TYPE L OR K SILVER SUPPORT BID SET
<br /> VRF REFRIGERATION ALL LOCATIONS 2" ASTM B280 WROUGHT COPPER 150 PSI 300 PSI PVC/ABS
<br /> COPPER, ACR BRAZED
<br /> (SCHED 40) 1/T -2" 3/8" ANVIL 69 167
<br /> CONDENSATECOPPER TYPE L • WATER SAFE CAST IRON This drawing is:
<br /> C INTERIOR ABOVE GRADE 1!2"-2"DRAINAGE HARD DRAWN ASTM B88 WROUGHT COPPER AMBIENT 5 PSIG
<br /> SOLDER BCUP PVC/ABS 1. Copyright 2017 Dykeman, Inc. C
<br /> 2. The Architect's Instrument of Professional Service.
<br /> (SCHED 40) 2-1/2"-6" 3/8" ANVIL 200 167 3. For use on this project only. Obtain Architect's
<br /> CAST IRON written permission for any other use or reproduction.
<br /> PROJECT NUMBEFAIMEMM
<br /> PIPING VOLUME AND MAXIMUM PIPING LENGTHS 2017-008
<br /> HVAC PIPING INSULATION SCHEDULE
<br /> MAXIMUM PIPING LENGTH
<br /> NOTE: ALL SYSTEMS AND PIPING MATERIALS MAY NOT BE USED ON EVERY PROJECT NOMINAL PIPE SIZE VOLUME (FEET)
<br /> (INCHES) (LIQUID OUNCES PER FOOT LENGTH) REVISIONS: '
<br /> MINIMUM INSULATION THICKNESS PUBLIC LAVITORY FAUCETS OTHER FIXTURES AND APPLIANCES
<br /> FLUID OPERATING INSULATION MEAN TEMP 1/4 0.33 6 50
<br /> SYSTEM TEMP INSULATION TYPE CONDUCTIVITY MARK DATE DESCRIPTION
<br /> (CF)
<br /> (BTU/IN)/(HR-FT2-F) 1.5" AND LESS 2"AND LESS REMARK 5/16 0.5 4 50
<br /> 08-17-17 DD COST EST.
<br /> THAN 8" 3/8 0.75 3 50 08-17-17 DD SUBMITTAL
<br /> 1/2 1.5 2 43 08-14-18 PERMIT SUBMITTAL -
<br /> -
<br /> CONDENSATE DRAINAGE INSIDE BUILDING 45-55 FIBERGLASS W/ALL SERVICE JACKET 0.24-0.27 N/A 0.5 0.5 1 09 10 18 BID SET
<br /> 5/8 2 1 32
<br /> VRF SYSTEM REFRIGERANT PIPING FLEXIBLE ELASTOMERIC INSULATION 0.24-0.27 75 0.75 1 1, 2 3/4 3 0.5 21
<br /> (ASTM C-534) (ARMAFLEX OR EQUAL)
<br /> 7/8 4 0.5 16
<br /> 1 5 0.5 13
<br /> NOTES: 1. INSULATION TO BE FIELD APPLIED. EXTERIOR INSULATION TO HAVE STANDARD UV RESITANT WHITE PVC JACKET 1 1/4 8 0.5 8
<br /> 2. LINESETS USED IN CONCEALED LOCATION TO HAVE FACTORY APPLIED INSULATION WITH FIELD APPLIED PATCH/ REPAIR 1 1/2 11 0.5 6
<br /> AS NEEDED FOR CONNECTIONS 2 OR LARGER 18 0.5 4
<br /> C404.3.1 Maximum allowable pipe length method.
<br /> The maximum allowable piping length from the nearest
<br /> ture
<br /> MECHANICAL PIPE HANGER SCHEDULE supplyce pipof e hallbter tertotordanche ination efollof the following.supply pipe shall be in accordance with the following.
<br /> B HORIZONTAL HANGER SPACING Where the piping contains more than one size of pipe, B
<br /> PIPE SIZE RANGE the largest size of pipe within the piping shall be used
<br /> PIPING MATERIAL for determining the maximum allowable length of the PROJECTAT_EA11
<br /> 0.5"-0.75" 1"- 1.5" 2" 2.5" -3" 4" 6" piping in Table C404.3.1.
<br /> PRINCIPAL IN CHARGE: 1 RH
<br /> COPPER 6 FT 6 FT 10 FT 10 FT 10 FT NA 1. For a public lavatory faucet, use the"Public
<br /> STEEL 10 FT 10 FT 12 FT 12 FT 12 FT 12 FT lavatory faucets" column in Table C404.3.1. PROJECT MANAGER: I RH
<br /> HANGER SCHEDULE 2. For all other plumbing fixtures and plumbing PRDROJECT AWN BY:ENGINEER: I K
<br /> LY
<br /> appliances, use the"Other fixtures and
<br /> PIPING MATERIAL PIPE SIZE GALV. ROD MFG. FIG. SHIELD COMMENTappliances" column in Table C404.3.1. KEYPLAN:
<br /> COPPER 0.5" -2" 3/8" SUPER STRUT CT-69 167 •-COPPER 2.5" -4" 1/2" SUPER STRUT 260 167
<br /> STEEL 0.5" -2" 3/8" SUPER STRUT 69 167
<br /> STEEL 2.5" -4" 1/2" SUPER STRUT 260 167
<br /> RISER SUPPORT SCHEDULE
<br /> PIPING MATERIAL PIPE SIZE MANUFACTURER FIG. COMMENT
<br /> - COPPER 0.5" -2" SUPER STRUT CT-121 -
<br /> COPPER 2.5" -4" SUPER STRUT CT-121
<br /> STEEL 0.5" -2" SUPER STRUT 261
<br /> STEEL 2.5" -4" SUPER STRUT 261
<br /> HANGER ROD-GRINNELL FIG. 146, GALV. ALL TI-IRD
<br /> ATTACHMENTS TO BEAMS- GRINNELL FIG. 14
<br /> PIPE STANCHION SADDLE-GRINNELL FIG. 258, 259,191
<br /> DRAWINGATITLE:
<br /> STRUT AND MISC. STL-SUPERSTRUT, PER FIELD FOREMAN SELECTION
<br /> STRUT PIPE CLAMPS - SUPERSTRUT FIG. 7701, DT-701, 702, WITH 716 PIPE ISOLATOR
<br /> A A
<br /> ACCEPT. ALT. MFG'S: MICHIGAN, TOLCO, SUPERSTRUT, B-LINE, OR APPROVED SCHEDULES
<br /> NOTES:
<br /> 1. FIELD FOREMAN TO REVIEW AND APPROVE HANGERS PRIOR TO ORDER
<br /> 2. FIELD FOREMAN MAY DEVIATE, WITH APPROVAL FROM TRADE SUPERINTENDANT DRAWING NUMBER:
<br /> M ® 04
<br /> 4