Laserfiche WebLink
City of Everett 01 1100 - 4 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> or grade, or modified in such references. All work shall conform to the standard <br /> referred to, except as modified in these specifications and the drawings. <br /> 1.10 CHECKING PLANS AND SPECIFICATIONS <br /> A. PRIOR SUBMISSION OF BIDS: The Contractor shall report any discrepancies <br /> or omissions in the plans and/or specifications to the Architect for a decision prior <br /> to the Submission of Bids. <br /> B. RESOLUTION OF CONFLICTS: Where there is conflict between the plans and <br /> the specifications in regard to materials, equipment, sizes, numbers or locations, <br /> the Owner shall be the sole judge in resolving the conflict. <br /> END OF SECTION 01 1100 <br /> 01 1100 - 4 SUMMARY OF WORK <br />