My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 1100 - 3 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> 1.6 PERMITS <br /> A. The Contractor shall be responsible to obtain and pay the cost of any applicable <br /> permits required to do the Work, and such costs shall be included in the Bid. <br /> 1.7 WORK BY OTHERS <br /> A. The Contractor is required to coordinate all their activities with the City's Project <br /> Manager, or his/her designee. The City may have other construction projects in <br /> progress at WPCF during the duration of this project and it is the Contractor's <br /> responsibility to assure that adequate notice is given to the City's Project <br /> Manager regarding equipment or materials that may need to be relocated in order <br /> to perform the work. <br /> 1.8 WORK BY THE OWNER <br /> A. The City shall have the right to access the site 24/7 and execute work not included <br /> in this Contract and concurrent with the contract period. Contractor shall <br /> cooperate with such City sponsored efforts. <br /> B. The Contractor shall coordinate with the City in scheduling operations to minimize <br /> conflict with concurrent construction projects, plant operations and maintenance <br /> activities. <br /> 1.9 CODES AND STANDARD SPECIFICATIONS <br /> A. All construction shall be in accordance with the International Building Code, <br /> Current Adopted Edition. <br /> B. All construction shall be in accordance with the Uniform Mechanical Code, and <br /> the Uniform Plumbing Code, latest editions. <br /> C. All construction shall be in conformance with the WSDOT/APWA Standard <br /> Specifications and Standard Plans, latest editions. <br /> D. All construction shall be in conformance with the City of Everett Design and <br /> Construction Standards and Specifications, latest edition. <br /> E. All work shall comply with applicable requirements of Snohomish County. <br /> F. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as Commercial Standard Federal Specifications, a trade <br /> association standard, or other similar standard, shall comply with the <br /> requirements of the latest revision thereof, and any amendment or supplement <br /> thereto in effect on the date of Invitation for Bids, except as limited to type, class <br /> 01 1100 - 3 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.