My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Aspect Consulting LLC 8/3/2020
>
Contracts
>
6 Years Then Destroy
>
2020
>
Aspect Consulting LLC 8/3/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2020 12:17:46 PM
Creation date
8/10/2020 12:17:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Aspect Consulting LLC
Approval Date
8/3/2020
End Date
12/31/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Grand Ave Utilities Replacement
Public Works WO Number
UP3711
Tracking Number
0002382
Total Compensation
$22,213.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> Aspect <br /> CONSULTING <br /> June 30, 2020 <br /> Arnie Roshak, P.E.,Associate Engineer <br /> City of Everett,Public Works—Utilities Engineering <br /> 3200 Cedar Street <br /> Everett,Washington 98201 <br /> Re: Proposal for Geotechnical Engineering Services <br /> Grand Avenue Utilities Replacement, UP No. 3711 <br /> Grand Avenue between 19th Street and Hewett Avenue <br /> City of Everett, Washington <br /> Project No. 170095-02 <br /> Dear Ms. Roshak: <br /> As requested, Aspect Consulting,LLC (Aspect)has prepared this proposal for the City of Everett's <br /> (City) Grand Avenue Utilities Replacement, UP No. 3711 (Project). The following proposal <br /> includes our project understanding, scope of work,cost estimate,and schedule for completing the <br /> tasks and services. <br /> Project Understanding <br /> We understand the City plans to install new water, sanitary sewer, and storm pipe on Grand Avenue <br /> from 19th Street to Hewitt Avenue. The Project will replace aging cast iron water mains, and <br /> address condition and capacity issues in the combined sewer system. The project will include <br /> stormwater separation,with installation of a new storm main. The new combined sewer main will <br /> replace the aging dual sewer mains along Grand Avenue. In the future,the storm and sewer pipes <br /> will convey flow to the proposed Port Gardner Storage facility. Aspect previously completed a <br /> geotechnical evaluation 1 for the water main replacement, previously referred to as Water Main S <br /> Replacement. <br /> Based on the plans and profiles provided by the City,the additional storm and sanitary sewer <br /> utilities will extend as deep as 20 feet below existing ground surface(bgs), significantly deeper than <br /> our previous explorations. Therefore,the City would like additional explorations to evaluate <br /> subsurface soil and groundwater conditions as a basis for geotechnical engineering <br /> recommendations in the design and construction of the storm and sanitary sewer main replacement. <br /> Proposed Scope of Work <br /> The purpose of our geotechnical services is to evaluate subsurface soil and groundwater conditions <br /> as a basis for providing geotechnical engineering recommendations. Our work is broken into the <br /> tasks outlined below. <br /> 'Aspect Consulting,LLC,2017,Geotechnical Letter Report—Draft,Water Main Replacement"S",Grand Avenue between 19th Street and <br /> Hewitt Avenue,Everett,Washington,Aspect Project No. 170095,dated May 11,2017 <br /> —�— Aspect Consulting,LLC 710 2nd Avenue Suite 550 Seattle,WA 98104 206.328 7443 wvvw.aspectconsulting.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.