Laserfiche WebLink
City of Everett <br /> Fire Administration Building Tenant Improvements Addendum No. 3 <br /> 2. See Revised Sheet A9.0 adding Closet 120 and associated finishes. <br /> Second Floor Room Finish Schedule <br /> 1. See Revised Sheet A9.0 deleting 'P3' paint for Rooms 218, 219, 220, 221 and 222. These <br /> ceiling finishes shall remain as is. <br /> First Floor Door Schedule <br /> 1. See Revised Sheet A9.0 adding new Door 117C and associated door hardware. <br /> Electrical: <br /> Sheet E4.1— First Floor Power Plan <br /> 1. New Conduit at Grid 6. Revise (N) 2" O.C. (TEL/DATA)to read as (N) 4" O.C. (TEL/DATA). <br /> New conduit shall still run continuous down to the basement. <br /> 2. New Closet Room 120. Add (1) new duplex receptacle on the North Wall. <br /> Sheet E4.2—Second Floor Power Plan <br /> 1. Existing and New Conduits East of Grid 6. Revise (E) 2" O.C. (TEL/DATA)to read as (E) 4" O.C. <br /> (TEL/DATA). Revise (N) 2" O.C. (TEL/DATA)to read as (N) 4" O.C. (TEL/DATA). New conduit <br /> shall still run continuous down to the basement. <br /> Fire Alarm Graphic Map (NTS) <br /> 1. See added drawing identifying Fire Alarm addressable heat and smoke detector locations. <br /> All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> END OF ADDENDUM NO.3 <br /> Page 4 of 4 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />