My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kirtley-Cole Associates LLC 8/11/2020
>
Contracts
>
Capital Contract
>
Kirtley-Cole Associates LLC 8/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:40 PM
Creation date
8/19/2020 10:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
8/11/2020
Council Approval Date
7/8/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Tracking Number
0002383
Total Compensation
$1,079,334.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> Fire Administration Building Tenant Improvements Addendum No.3 <br /> Sheet A1.0— Basement Floor Plan <br /> 1. Clarification. Only 'architectural'work on this floor plan is identified by Keynotes#1.14 and <br /> #1.15. Other Keynotes listed on this drawing sheet do not apply to this floor. <br /> Sheet A1.1—First Floor Plan <br /> 1. See revised Floor Plan for added room 'Closet 120'. <br /> Sheet A1.2—Second Floor Plan <br /> 1. Keynote 1.12: Change "New 1X chair rail..."to read as "New 1X4 paint grade chair rail...." <br /> Sheet A2.1—First Floor Reflected Ceiling Plan <br /> 1. See revised Reflected Ceiling Plan for added room 'Closet 120'. <br /> 2. ADA Restroom 112: The ceiling in this room is existing and shall receive paint as indicated on <br /> the Room Finish Schedule. <br /> 3. Hallway/Stair between Storage 105 and ADA Restroom 112: The ceiling is an existing <br /> acoustical tile ceiling to remain as is. <br /> Sheet A2.2—Second Floor Reflected Ceiling Plan <br /> 1. Clarification. All greyed out acoustical tile ceilings not identified by Keynote#2.7 are to <br /> remain as existing ceilings. <br /> Sheet A7.0—Interior Elevations <br /> 1. IBC Note#2, "Provide Signage per IBC 111.1". This accessible toilet signage shall be provided <br /> for ADA Restrooms 111 and 112. <br /> Sheet A8.0—Details <br /> 1. Detail 9. The new handrail is only required on one side of the stair as shown. <br /> 2. Detail 10.The new handrails as shown are only required from the First Floor up to the Second <br /> Floor. <br /> Sheet A8.1— Details <br /> 1. Detail 2 Clarification. Change "1X Door Trim (Typ.)"to read as "1x4 paint grade door trim to <br /> match other existing (Typ.)." <br /> Sheet A9.0—Schedules <br /> First Floor Room Finish Schedule <br /> 1. Where ceilings are identified as 'EXIST' and finish 'P3', the ceiling is required to be painted <br /> with this color specified. <br /> Page 3 of 4 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.