My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kirtley-Cole Associates LLC 8/11/2020
>
Contracts
>
Capital Contract
>
Kirtley-Cole Associates LLC 8/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:40 PM
Creation date
8/19/2020 10:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
8/11/2020
Council Approval Date
7/8/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Tracking Number
0002383
Total Compensation
$1,079,334.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 21 13 - 9 <br /> Fire Administration Building Tenant Improvements 18-1080 <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must <br /> file with each bond a certified and effectively dated copy of their Power of <br /> Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and <br /> Affidavit of Wages Paid (F700-007-000) from the Contractor, Subcontractor and <br /> agents to the Subcontractor shall be submitted to the Employment Standards <br /> Division, State Department of Labor and Industries, Olympia, Washington. If the <br /> prime contract is over $1,000,000, then Contractor also needs to submit L&I <br /> Form F700-164-000 (Affidavit of Wages Paid EHB 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br /> WH347): Contractors, Subcontractors, and agents to Subcontractors using <br /> Payroll Form WH347) may use State of Compliance found on back of form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH 348). <br /> Contractors, Subcontractors, or agents to Subcontractors not using Payroll Form <br /> WH347 shall attach the Statement of Compliance Form WH 348 to each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of <br /> Subcontractors on a form provided by the City prior to their working on the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section <br /> 007200, Part 5 "Progress and Completion", of the Contract Documents by the <br /> Contractor within ten calendar days, or such time as determined by the City, after <br /> the date of receipt of Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's <br /> Design and Construction Standards. If, and to the extent, such plans are not <br /> sufficient, complete or adequate to support the Bidder's planned means and <br /> methods of performing the Work, the Bidder must develop an adequate, <br /> complete and sufficient traffic control plan at its cost, that shall be submitted for <br /> the City's approval prior to construction. Deviation from the Standard Plans must <br /> be submitted by the Contractor and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the City with the location of all disposal sites to be used, <br /> and also provide copies of the permits and approvals for such disposal sites. <br /> The Contractor shall provide the City with copies of all permits for disposal and <br /> storage of surplus materials within ten calendar days after award of the Contract. <br /> 1.23 POSTPONEMENT OF OPENING <br /> A. The City reserves the right to postpone the date and time for receiving or opening of <br /> Bids, or both, at any time prior to the date and time established in the Notice to <br /> Bidders. Postponement notices shall be provided to Bidders in the form of addenda. <br /> 1.24 BUSINESS LICENSE <br /> A. A City of Everett business license is required for the Contractor and Subcontractors <br /> performing Work on this Project. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> 00 21 13 - 9 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.