My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kirtley-Cole Associates LLC 8/11/2020
>
Contracts
>
Capital Contract
>
Kirtley-Cole Associates LLC 8/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:40 PM
Creation date
8/19/2020 10:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
8/11/2020
Council Approval Date
7/8/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Tracking Number
0002383
Total Compensation
$1,079,334.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> Fire Administration Building Tenant Improvements Addendum No.2 <br /> a. COVID-19 Definitions. <br /> b. Responsibilities. <br /> c. Measurement and Payment. <br /> d. Contract Claims. <br /> Item 2—Remove and Replace Specification Section 00 41 13—Bid Form with revised 00 41 13 <br /> (Revision A 5/14/2020), revised section addresses Baseline COVID-19 Requirements <br /> compensation costs necessary for the work for compliance with Baseline COVID-19 <br /> Requirements. Additionally, space is provided as stated in Section 00 21 13, 1.6,for bid amount <br /> to be written in words. <br /> Item 3-Add Section 00 43 36—PROPOSED SUBCONTRACTORS FORM as part of the project <br /> manual. 00 43 36 Subcontractors form shall be submitted with the bid documents. <br /> Item 4- Make the following additions and changes to the bid set project Documents and <br /> Drawings: <br /> Project Manual Volume 1 Architectural: <br /> Section 09 65 00—Resilient Flooring <br /> 1. Article 2.1.E.1. The Mannington Commercial Sheet Vinyl flooring shall be from the Paradigm <br /> Collection, Streamline Pattern. Color shall be selected from submitted color range. <br /> DRAWINGS: <br /> Architectural: <br /> Sheet A4.0—Exterior Elevations <br /> West Elevation <br /> 1. See Keynote 4.10 on the revised drawing for approximate replacement window size on the <br /> Second Floor. The Contractor shall verify actual dimensions as part of the shop drawing <br /> submittal. <br /> 2. See Keynote 4.11 on the revised drawing for approximate replacement window size on the <br /> Second Floor. The Contractor shall verify actual dimensions as part of the shop drawing <br /> submittal. <br /> Sheet A4.1—Exterior Elevations <br /> North Elevation <br /> Page 2 of 3 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.