Laserfiche WebLink
City of Everett <br /> Fire Administration Building Tenant Improvements Addendum No.2 <br /> a. COVID-19 Definitions. <br /> b. Responsibilities. <br /> c. Measurement and Payment. <br /> d. Contract Claims. <br /> Item 2—Remove and Replace Specification Section 00 41 13—Bid Form with revised 00 41 13 <br /> (Revision A 5/14/2020), revised section addresses Baseline COVID-19 Requirements <br /> compensation costs necessary for the work for compliance with Baseline COVID-19 <br /> Requirements. Additionally, space is provided as stated in Section 00 21 13, 1.6,for bid amount <br /> to be written in words. <br /> Item 3-Add Section 00 43 36—PROPOSED SUBCONTRACTORS FORM as part of the project <br /> manual. 00 43 36 Subcontractors form shall be submitted with the bid documents. <br /> Item 4- Make the following additions and changes to the bid set project Documents and <br /> Drawings: <br /> Project Manual Volume 1 Architectural: <br /> Section 09 65 00—Resilient Flooring <br /> 1. Article 2.1.E.1. The Mannington Commercial Sheet Vinyl flooring shall be from the Paradigm <br /> Collection, Streamline Pattern. Color shall be selected from submitted color range. <br /> DRAWINGS: <br /> Architectural: <br /> Sheet A4.0—Exterior Elevations <br /> West Elevation <br /> 1. See Keynote 4.10 on the revised drawing for approximate replacement window size on the <br /> Second Floor. The Contractor shall verify actual dimensions as part of the shop drawing <br /> submittal. <br /> 2. See Keynote 4.11 on the revised drawing for approximate replacement window size on the <br /> Second Floor. The Contractor shall verify actual dimensions as part of the shop drawing <br /> submittal. <br /> Sheet A4.1—Exterior Elevations <br /> North Elevation <br /> Page 2 of 3 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />