My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kirtley-Cole Associates LLC 8/11/2020
>
Contracts
>
Capital Contract
>
Kirtley-Cole Associates LLC 8/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:40 PM
Creation date
8/19/2020 10:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
8/11/2020
Council Approval Date
7/8/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Tracking Number
0002383
Total Compensation
$1,079,334.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> Fire Administration Building Tenant Improvements Addendum No. 2 <br /> 1. See Keynote 4.10 on the revised drawing for approximate replacement window size on the <br /> Second Floor. The Contractor shall verify actual dimensions as part of the shop drawing <br /> submittal. <br /> 2. See Keynote 4.12 on the revised drawing for approximate replacement window size on the <br /> First Floor. The Contractor shall verify actual dimensions as part of the shop drawing submittal. <br /> South Elevation <br /> 1. See Keynote 4.10 on the revised drawing for approximate replacement window size on the <br /> Second Floor. The Contractor shall verify actual dimensions as part of the shop drawing <br /> submittal. <br /> 2. See Keynote 4.12 on the revised drawing for approximate replacement window size on the <br /> First Floor. The Contractor shall verify actual dimensions as part of the shop drawing submittal. <br /> Elevation Keynotes: <br /> 1. Delete Keynotes 4.4,4.5 and 4.6. The flagpole and concrete flagpole base has been <br /> eliminated from the project. <br /> Electrical: <br /> Sheet E0.0—Cover Sheet <br /> 1. General Notes: Revise General Note#11 to read as follows, "Provide bidder designed <br /> modifications to the existing fire alarm system at the station. Provide all modifications to meet <br /> all codes and to suit fire marshal. Obtain pre-approval of plans before ordering parts. Match <br /> original equipment manufacturer and provide additional modules, enclosures, devices and <br /> appurtenances as necessary". <br /> All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> END OF ADDENDUM NO.2 <br /> Page 3 of 3 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.