My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11627 AIRPORT RD AIRPORT RD BUSINESS PARK 2020-12-28
>
Address Records
>
AIRPORT RD
>
11627
>
AIRPORT RD BUSINESS PARK
>
11627 AIRPORT RD AIRPORT RD BUSINESS PARK 2020-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 2:46:33 PM
Creation date
8/27/2020 7:33:17 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11627
Tenant Name
AIRPORT RD BUSINESS PARK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01000 <br /> GENERAL CONDITIONS <br /> 1.01 DOCUMENTS <br /> The signed agreement,the present Drawings and all supplementary details to be made later, and <br /> the Specifications with subsequent amendments, are the documents forming the Contract. All are <br /> cooperative and what is called for by one shall be as binding as if called for by all. <br /> 1.02 DRAWINGS and SPECIFICATIONS <br /> A. The Drawings and Specifications referred to describe the construction and character of the <br /> different parts of the Work. All descriptions wherever they appear must be accurately followed. <br /> B. In case any discrepancy in the figures is discovered,the matter shall be immediately submitted to <br /> the Construction Manager for decision, and without this decision said discrepancy shall not be <br /> adjusted by the Contractor save at their own risk. In the settlement of any complication arising <br /> from said adjustment,the Contractor shall bear all the extra expense involved. <br /> 1.03 CONTRACTOR <br /> A. The term "Contractor"herein shall in all cases mean the Roofing Contractor,unless otherwise <br /> stated. <br /> B. The Contractor shall give his personal superintendance and direction to the Work,and shall keep <br /> a competent foreman constantly on the grounds authorized to receive instructions and act on his <br /> behalf. He shall provide all labor,transportation, materials, apparatus, scaffolding, and <br /> equipment necessary for the completion and substantial execution of everything shown, <br /> described, or reasonably implied in the Drawings and Specifications. <br /> C. The Contractor shall carefully lay out his work and he shall be responsible for any mistakes he <br /> may make, and any injury resulting from them. He shall attend to every part of the work <br /> personally or through a competent foreman; shall give necessary lines, levels,patterns,and <br /> dimensions according to the Drawings and Specifications; shall see that they are preserved and <br /> followed correctly, and that all the requirements of the Drawings and Specifications and Contract <br /> are followed by subcontractors and employees at all times. <br /> 1.04 DEFINITION OF OWNER <br /> Wherever the term Owner appears, it shall mean the Gilbraltar,LLC. <br /> 1.05 DEFINITION OF CONSTRUCTION MANAGER <br /> Wherever the term Construction Manager appears, it shall mean the Engineer,Roof Engineering <br /> Technologies, or his/her authorized representative. <br /> 1.06 PUBLIC ORDINANCES AND REGULATIONS <br /> A. It is the intent of these Drawings and Specifications to comply with all local and state ordinances <br /> AIRPORT RD.BUSINESS PARK REROOF 01000-1 2-21-2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.